31
UPRIGHT
INSTALL
Center 2539-ST. Mark and Pre drill 7/16" through-holes for hex bolt.
A - FRAME
ASSEMBLE
T-Nut
x2
x2
3 x 3 x 95"
2525-W
Rotate 2525-W 180
o
after
installing T-Nuts.
HARDWARE
BAGS
NEEDED:
17013
HARDWARE
BAGS
NEEDED:
17014
x1
5/4 x 4 x 47"
1-3/4" Hex Bolt
Lock Washer
Flat Washer
x2
x2
T-Nut
EQUAL
EQUAL
2505-ST
2539-ST
Содержание 4430
Страница 2: ...This page intentionally left blank...
Страница 52: ...This page intentionally left blank...