![background image](http://html1.mh-extra.com/html/backyard-play-systems/4105/4105_instruction-manual_3348600046.webp)
44
SLIDE
SURFACING MATERIAL
Apply Surfacing Material at
recommended depth, or deeper.
SLIDE
Locate Slide in the opening between Balusters
on the FRONT SIDE of the Tower.
Pre-drill 1/8
”
pilot holes through Slide at dimples,
through deck planks, and into lower slide support.
Ensure screws are installed through deck planks.
Move slide slightly to avoid spaces between planks.
FRONT SIDE
2-1/2
”
Pan Head Wood Screw x2
1/4 x 1
”
Fender Washer x2
INSTALL
4-1/2
”
x1
2099-Y
Apply Surfacing Material at
recommended depth, or deeper.