![Backyard Play Systems 4105 Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/backyard-play-systems/4105/4105_instruction-manual_3348600009.webp)
7
IMPORTANT!
A
A
B
B
U
s
e the
s
e A
ss
embly Procedure Hint
s
throu
g
hout the in
s
tallation proce
ss
.
1. All Lag Bolts must have pre-drilled holes. Use a 1/4” drill bit for all 3/8” Lag Bolts.
Pre-drilling pilot holes will help prevent Screws and Lag Bolts from breaking and
wood from splitting during assembly.
2. In areas where drilling a larger 1/2” hole is neccessary, such as when installing T-Nuts,
(Fig. 1) the recommended procedure is to first drill-through a 1/4” pilot hole from the
Hex Bolt side and then drill the larger 1/2” hole from the opposite T-Nut side. This will
help avoid splintering the wood. The “
Drill Both
S
ide
s
ICON
” (Fig. 1) will remind you to
drill according to this procedure. Be sure to clean through-holes of debris before
inserting Hex Bolts.
3. When assembling parts that are difficult to hold in position while pre-drilling pilot holes
or assembling, use a clamp to keep parts aligned or in position. The “
Clamp ICON
”
(Fig. 2) will advise you to use this procedure.
Fi
g
. 1 (example)
Fi
g
. 2
Drill Both
S
ide
s
ICON
Clamp ICON
1/4” pilot hole
1/2” drill throu
g
h