ITEMS FOR PHASE 1
LABEL
DESCRIPTION
QTY
SCREW PFH 8x1-1/2
72
E72
E72-36x86x1570 LEFT RAIL
1
E73
E73-36x86x1570 RIGHT RAIL
1
M74
M74-16x86x675 ROCK WALL BOARD
10
M75
M75 - 16x86x675 1 ROCK WALL BOARD
4
M76
M76-16x86x675 2 ROCK WALL BOARD
4
N71
N71-16x60x707 ROCK WALL END BOARD
1
5 Ft Rock Wall
Phase 1
Phase Notes
• Assemble slats to rails as shown.
• Note orientation of slats and arrange as shown.
• Attach top board first. See detail at bottom.
• Using slats as a guide, pre-drill edges of rails
with a 1/8" drill bit. Failure to pre-drill may result
in board splitting.
TOP
TOP
SCREW PFH 8x1-1/2
PRE-DRILL FOR EACH SCREW