ITEMS FOR PHASE 11
LABEL
DESCRIPTION
QTY
L BRACKET GREEN 54x67
4
SCREW TAPPING 14x3/4
8
B4
FORT UPRIGHT
2
B6
FORT UPRIGHT
1
B8
FORT UPRIGHT
1
Fort Assembly
Phase 11
Phase Notes
• Assemble with hardware as shown.
• Notice two enlarged details, showing the brackets flush with the inside of
the uprights. The other two brackets can be centered on the uprights.
• Align upper uprights (B4) with lower uprights (B5 and B7).
THESE
SURFACES
FLUSH
THESE
SURFACES
FLUSH
SCREW TAPPING 14x3/4
L BRACKET GREEN 54x67
FORT UPRIGHT-B4
B4
FORT UPRIGHT-B8
FORT UPRIGHT-B6
THESE
SURFACES
FLUSH
(FRONT
& SIDE)
B5
B7