DOOR
13
LEVEL AND SQUARE FLOOR FRAME
Before attaching fl oor decking, it is important to level and square the fl oor frame.
A level and square fl oor frame is required to correctly construct your shed.
• 3" Screw angled into 4x4.
• (2) at each point frame and 4x4 touch.
DO
OR
FINISH
5
BEGIN
2
3
4
1
Use level and check the frame is level before applying fl oor panels.
Check for frame squareness by measuring diagonally across corners.
If the measurements are the same, the frame is square. The diagonal
measurement will be approximately 151-1/2" (385 cm).
When the frame is level and square secure one side of frame to the 4x4 runners using one fastener at
ends of each runner. At the opposite end of the frame, secure the frame to 4x4 runners with one fastener
at ends of each runner making sure the frame remains square
(Fig. A)
.
Once the fl oor frame is level and square fasten the frame at each point the frame contacts the 4x4
runners. Use minimum of 12 screws for each runner. Go to page 16.
See page 9 for the preferred fl oor leveling method.
First, secure
at ends with
one fastener.
Second,
secure at
ends with
one fastener.
151-1/2"
(385 cm)
151-1/2"
(385 cm)
Fig. A
12"
(30,5 cm)
12"
(30,5 cm)
Содержание GABLE
Страница 2: ... This page intentionally left blank ...