STEP 1
LAY TWO E1 FORT UPRIGHTS FLAT ON GROUND.
ATTACH G1 BOARD TO E1 FORT UPRIGHTS USING 2-1/4" BOLTS, LOCK WASHERS AND 5/16" T-NUTS.
USING M1 AS A TEMPLATE, PILOT DRILL USING 1/8" DRILL BIT AND ATTACH M1 BOARD TO E1 FORT UPRIGHTS
USING 1-1/2" SCREWS.
ATTACH E3 BOARD TO E1 FORT UPRIGHTS USING 2-3/4" BOLTS, LOCK WASHERS AND 5/16" T-NUTS.
E1
E1
E3
M1
G1
BOLT WH
5/16x2-1/4
(8)
BOLT WH
5/16x2-3/4
(8)
WASHER
LOCK EXT
8x19
(16)
SCREW PFH
8x1-1/2"
(4)
STEP 2
LAY TWO E1 FORT UPRIGHTS FLAT ON GROUND.
ATTACH G1 BOARD TO E1 FORT UPRIGHTS USING 2-1/4" BOLTS, LOCK WASHERS AND
5/16" T-NUTS.
ATTACH E3 BOARD TO E1 FORT UPRIGHTS USING 2-3/4" BOLTS, LOCK WASHERS AND
5/16" T-NUTS.
E1
E1
E3
G1
E1 - A-FRAME BOARD - W102475
1 3/8"x3 3/8"x85" (36x86x2159)
(4)
G1 - GROUND BOARD - W102479
1"x5 1/4"x88 3/8" (24x134x2244)
(2)
M1 - SWING BLOCK - W102485
5/8"x3 3/8"x60" (16x86x1524)
(1)
E3 - FLOOR RAIL - W102476
1 3/8"x3 3/8"x41 3/8" (36x86x1052)
(2)
T-NUT 5/16
(16)