SLIDE ASSEMBLY
STEP 2
TIP: A HELPER IS REQUIRED FOR THIS PHASE.
NOTE:
MAKE CERTAIN
SUPPORTS AND SLIDE
BED ARE FULLY
ENGAGED WITHIN
CHANNEL OF SLIDE
RAILS.
SCREW PFH
8x2 1/2
(24)
M78
-
CENTER SLIDE BRACE
-
W100545
(2)
HA
-
SLIDE RAIL 8' BLUE LEFT
-
A100162
(1)
GZ
-
SLIDE RAIL 8' BLUE RIGHT
-
A100161
(1)
PRE-DRILL USING 1/8" DRILL BIT.
SCREW PFH 8x2 1/2
(24 PLCS)
M78
M78
SLIDE RAIL 8' BLUE RIGHT
SLIDE RAIL 8' BLUE LEFT
Содержание 1605022
Страница 42: ...STEP 11 SCREW PFH 8x2 4 H3 SCREW PFH 8x2 4 PLCS H3 FLOOR SUPPORT W4L06915 1 x3 3 8 x40 7 8 24x86x1038 1...
Страница 57: ...STEP 26 J10 ROOF BOARD W4L06952 1 x2 3 8 x4 24x60x102 2 UNDERNEATH J10 J10 SCREW PFH 8x1 4 SCREW PFH 8x1 4 PLCS...
Страница 60: ...STEP 29 SCREW PWH 8x5 8 10 SCREW PWH 8x5 8 10 PLCS TARP TARP A6P00123 43 1 4 x93 1 2 1100x2374 1...
Страница 63: ...STEP 32 BENCH ASSEMBLY BOLT WH 5 16x1 2 2 BOLT WH 5 16x1 2 2 PLCS BENCH ASSEMBLY...
Страница 64: ...STEP 33 MONKEY BAR ASSEMBLY MONKEY BAR ASSEMBLY BOLT WH 5 16x3 4 2 BOLT WH 5 16x3 4 2 PLCS...