Bacharach Parasense GRM2 CO2 Series Скачать руководство пользователя страница 1

 

 

 

 
 

 

 
 
 

GRM2 CO2 

 

REFRIGERANT MONITOR 

 
 

OPERATION & MAINTENANCE MANUAL 

 

Models 

GRM2-104D2-1xxCO2 

 

Doc. Ref. MNGRM2CO2 REV. 3 

 
 
 
 

 

 

 

Содержание Parasense GRM2 CO2 Series

Страница 1: ...GRM2 CO2 REFRIGERANT MONITOR OPERATION MAINTENANCE MANUAL Models GRM2 104D2 1xxCO2 Doc Ref MNGRM2CO2 REV 3...

Страница 2: ...ossible it may contain unintentional typographical or technical errors Any errors found are changed and incorporated into a revised edition of this document Parasense assumes no responsibility for its...

Страница 3: ...TWORKED GAS SENSORS 2 9 OPTIONAL ATM2R SINGLE MULTIPLE BEACON INSTALLATION 2 10 OPTIONAL NETWORKED GAS SENSORS 2 11 OPTIONAL ANALOGUE SENSOR TRIP MODULE 2 12 3 ADC 104 TERMINAL PANEL OPTIONAL 3 1 ADC...

Страница 4: ...ALIBRATION CO2 CLAIRAIR SENSOR 7 19 SYSTEM TEST RS485 NETWORKED SAMMS 7 24 SYSTEM TEST RS485 AMMONIA NETWORKED SAMMS 7 26 SYSTEM TEST BACHARACH MGS 150 SENSORS 7 28 ZERO CALIBRATION OF SMARTGAS RS485...

Страница 5: ...nagement logos added Optional ADC terminal panel details updated DG 2 3 25th Jan 2017 Improved instructions for making a network connection to the GRM2 System test instructions updated Zero calibratio...

Страница 6: ...RS485 network terminals Samples are gathered locally and the information relayed back to the GRM2 CO2 via the RS485 network connection A Parasense ATM2R cluster module is required for each network se...

Страница 7: ...1 2 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 GENERAL ARRANGEMENT...

Страница 8: ...work must be carried out by SUITABLY QUALIFIED PERSONNEL ONLY and must be in accordance with the current regulations Four fixing brackets are supplied loose choose orientation horizontal vertical ins...

Страница 9: ...ion of the conductors from abrasion The protective earth conductor if any shall be the last to take the strain if the cable slips in its anchorage Cable anchorages shall meet the following requirement...

Страница 10: ...2 3 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 MAINS INPUT CONNECTIONS SINGLE GROUND EARTH SCREW CONNECTION...

Страница 11: ...t Relay Module The relays are configured using the configuration tool Refer to the monitor setup section of this manual for more information Relays become energised when the monitor is powered up i e...

Страница 12: ...e mounted RJ45 connector FREEWAY INSTALLATION GUIDELINES Parasense sampling pipework known as freeway is used to draw samples of air from areas of potential leakage to the respective internal SAMM of...

Страница 13: ...l be in the same room Locate sample points as close as possible to the potential leakage areas Cut the freeway straight using the Parasense supplied cutter INSTALLATION DON T S Exceed 150m 492ft of fr...

Страница 14: ...2 7 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 NETWORK MODULE CONNECTIONS...

Страница 15: ...Parasense Beacon sounders 0 6A between 50 60 C 122 140 F enclosure temperature max 5 Parasense Beacon sounders No spare capacity above 60 C 140 F Parasense Beacon sounder Imax at 24V DC When wired C N...

Страница 16: ...g RS485 networked gas sensors is shown below The analogue sensor trip module RM2C 104 ATM2R must be installed at the gas sensor end of the installation either inside or outside the room being monitore...

Страница 17: ...Ref MNGRM2CO2 REV 3 OPTIONAL ATM2R SINGLE MULTIPLE BEACON INSTALLATION Each analogue sensor trip module RM2C 104 ATM2R can accommodate up to two beacon sounders Below is the diagram for the connectio...

Страница 18: ...ntenance Manual Doc Ref MNGRM2CO2 REV 3 OPTIONAL NETWORKED GAS SENSORS The gas sensors are wired to the analogue sensor trip modules RM2C 104 ATM2R as detailed below Some examples of the gas sensors a...

Страница 19: ...tenance Manual Doc Ref MNGRM2CO2 REV 3 OPTIONAL ANALOGUE SENSOR TRIP MODULE The analogue sensor trip module RM2C 104 ATM2R is wired as follows on the RS485 network The analogue sensor trip module with...

Страница 20: ...ccordance with the current regulations Enclosure Fitting Guide 1 It must be mounted to a solid vertical surface or structure capable of supporting the stated weight We recommend the surface be built f...

Страница 21: ...Doc Ref MNGRM2CO2 REV 3 ADC 104 MAINS POWER INPUT CONNECTIONS Single Ground Earth Screw Connection GRM2 CO2 WITH ADC 104 INSTALLATION OVERVIEW NOTE For full installation and maintenance details please...

Страница 22: ...Windows 10 Windows 8 with variations for Windows 7 Windows XP is covered separately WINDOWS 10 8 and WINDOWS 7 1 Take a note of the current network settings of the GRM2 CO2 system please refer to the...

Страница 23: ...s 192 168 0 50 then enter any value other than 50 Note there must be no other device connected to the same network with the same IP address you have used e g using the above screenshot as an example t...

Страница 24: ...ick the Local Area Connection option and choose Properties from the popup menu 5 Scroll down the list in the middle of the form and click on Internet Protocol TCP IP then click the Properties button C...

Страница 25: ...period of 4 minutes the display will return to the home screen The LED s will continue to indicate the current status of the system As soon as a button is pressed the display will illuminate and the...

Страница 26: ...ve occurred over the recording period 1 to 14 days as set during configuration GRM2C 16 0 alarms in last 7 days Pressing the centre button on the keypad accesses the main menu Please select SAMMs list...

Страница 27: ...ven during configuration is not available to the display Compressor 1 2 3 4 Alarm 5000 Crit 15000 CO2 Chan Status Conc Alarm 1 Healthy 0 None 2 Healthy 0 None 3 Sampling 0 None 4 Healthy 0 None 5 Heal...

Страница 28: ...o view the most recent 100 alarms Eight entries are displayed on each page Use the buttons to highlight the desired channel The name of the selected channel is displayed at the top of the screen The a...

Страница 29: ...1 2 3 4 Time Date Chan Fault 16 06 10 Mar 15 1 Pump flt Back Next page Because of the restricted space available on screen all fault descriptions are given an abbreviated format A full list of abbrev...

Страница 30: ...1 Crit ON 10 05 10 Mar 10 1 Alrm ON 10 01 10 Mar 10 3 Alrt OFF 09 44 10 Mar 10 3 Alrt ON 15 58 01 Mar 10 Power ON Back Next page Because of the restricted space available on screen each event descrip...

Страница 31: ...the selected channel SYSTEM TEST Select channel to test using up and down buttons Press Action to test Channel 1 SAMM 01 Back SYSTEM TEST Select channel to test using up and down buttons Press Action...

Страница 32: ...isplayed MANAGEMENT Please select System test Network settings Network defaults Reboot GRM2C Change passcode Home Menu NETWORK SETTINGS Network Settings will display the current IP network settings of...

Страница 33: ...to the management menu leaving the network settings unchanged Pressing the button will also abort this function and return to the management menu leaving the network settings unchanged REBOOT GRM2C I...

Страница 34: ...to select If you wish to delete the characters highlight C clear and press the button All characters entered will be deleted CHANGE PASSCODE 1 2 3 4 5 6 7 8 9 C 0 E Once you have entered the new pass...

Страница 35: ...s If there is no keypad activity for 3 minutes the LCD back light will switch off and the display will go dark The traffic light display will still function to the present status of the system Any key...

Страница 36: ...If a reading has been detected in excess of the configured alarm thresholds the traffic light display will indicate the level of that alarm The alarm count on the home screen will be incremented and...

Страница 37: ...ion afforded by the equipment Parasense offers a wide range of service and maintenance contracts remote access software and management reporting packages Details and cost of service exchange units can...

Страница 38: ...d all connections are secure switch on at the internal power input module by pressing the green button close and lock the door and reinstate the mains power supply If the fault does not clear refer to...

Страница 39: ...a has a higher CO2 concentration than the system is designed to monitor In exceptional circumstances it is possible that the network module AND the PSU have developed a fault All fault finding steps m...

Страница 40: ...nual sample with the door open before making the following additional checks 4 Confirm solenoid 1 has 0V DC across it and solenoid 2 24V DC across it when the pump has just started running After a per...

Страница 41: ...ontrast as required refer to section 5 1 4 Using the latest version of the GRM2 configuration tool Load the configuration obtained in step 2 above and send this to the GRM2 You will need a working net...

Страница 42: ...he enclosure door can now be lifted off and a new one hung in place Replace the anti lift peg Reconnect the earth strap and display power lead Fit the display lead clips to the enclosure door Check al...

Страница 43: ...hanged from that used in step 1 above Procedure for removal and refitting Switch off the mains supply to the monitor and wait for a few seconds while the power supply discharges Open the enclosure doo...

Страница 44: ...of the enclosure To install the new SAMM block fit the new SAMM block in the vacant position Note It will only fit with the 8 short sampling pipes facing towards the front of the enclosure Fit the sh...

Страница 45: ...nect the cables to the network module 3 Disconnect the pneumatic hoses at the Styx module white tee 4 and the black Y 5 Remove the 5 fixing nuts and shake proof washers on the Styx module base plate 6...

Страница 46: ...er supply cables to the power input module 2 and power output cables 3 Disconnect the earth strap 4 Unscrew the four nuts 5 holding the power supply module located around the edge of the insert plate...

Страница 47: ...ovided and switch off at the internal power input module using the red button 1 Disconnect the cables to the dual pilot relay module 2 Unscrew the four nuts 3 holding the dual pilot relay module in po...

Страница 48: ...utine is as follows a Before commencing a system check confirm that the monitor has been running continuously for a period of at least four hours with the door closed and locked this will ensure that...

Страница 49: ...nth intervals AIR FLOW INTERNAL SAMMS Disconnect the freeway sampling pipe from SAMM channel 1 using the Parasense pipe release tool and insert into the connector on the pipe from the lower port of th...

Страница 50: ...as a different function as indicated D Previous Decrease C Next Increase B Enter A Menu Sensor PCB The Parasense CO2 calibration kit includes 1 x 10 litre cylinder of 100 Nitrogen test gas labelled CO...

Страница 51: ...le for a second time 11 Wait for the sample process to complete 12 On the sensor PCB 12 1 Press B to zero the sensor will be displayed to confirm the sensor zero calibration has been performed NOTE Pr...

Страница 52: ...been performed NOTE Pressing A rather than B exits without performing sensor span calibration 12 3 Press A to close the menu system NOTE The sensor span calibration value will be displayed on exit whi...

Страница 53: ...note the ADC 12 0 value reported highlighted below in yellow Channel Bits mVolts Value Pressure 187 456 1111 Detector 2 4 Source 5 12 ADC 3 786 1918 DAC offset 518 1264 Amb Temp 210 512 307 ADC12 0 40...

Страница 54: ...te the ADC 12 0 value reported highlighted below in yellow Channel Bits mVolts Value Pressure 187 456 1111 Detector 2 4 Source 5 12 ADC 3 786 1918 DAC offset 518 1264 Amb Temp 210 512 307 ADC12 0 2000...

Страница 55: ...is completely empty 2 Fill to 75 full the CO2 ZERO sample bag with CO2 ZERO test gas 3 On the GRM2 CO2 display keypad navigate to the System Test screen 4 Use the Up Down keys to select a channel on...

Страница 56: ...ple bag to the channel selected for System Test 6 On the sensor PCB 6 1 Press the A button to show Cal Mode 6 2 Press the B button Y on the display 6 3 Press the C button on the display to show Set Sp...

Страница 57: ...C01 programming debug lead to the CC01 programming debug port on the GRM2 CO2 network module PCB 3 Open a terminal program and connect to the CC01 using 9600 baud 8 data bits 1 stop bit No parity No f...

Страница 58: ...he key to exit the System Test function Normal sampling will resume Sensor 20mA Calibration 1 On the GRM2 CO2 display keypad navigate to the System Test screen This will halt the sampling activity on...

Страница 59: ...Sensor PCB 7 1 Use the C and D buttons to adjust the 4mA output 8 Repeat steps 6 7 until the adc command output reads 2000 1 9 On the Sensor PCB 9 1 Press the B button Y on the display to save the val...

Страница 60: ...ciated field wiring and beacon sounders using specific concentrations of the target gas referred to here as the test gas The concentration of the test gas should be greater than the critical threshold...

Страница 61: ...r a successful system test Ensure the flow meter 4 is upright while the test gas is flowing to obtain an accurate flow rate reading g Allow the test gas to flow for a period of 60 seconds After 60 sec...

Страница 62: ...the Parasense test gas cylinder 1 Ensure the knurled knob on valve 2 is fully unwound anti clockwise and screw valve on to the gas cylinder Ensure the sample bag valve 5 is fully shut c Connect the i...

Страница 63: ...ted j When the test in complete ensure valve 5 is fully closed and disconnect from the gas sensor k At the GRM2 CO2 monitor The SAMMs List screen allows you to see the current concentration of each ch...

Страница 64: ...ocedures below Annual checks and gas calibration are recommended It is also recommended that sensors are replaced every 3 years or as required Calibration frequency may be extended based on applicatio...

Страница 65: ...nd the output 0 5V for example will show the gas level Ideally bump tests are conducted on site in a clean air atmosphere The bump test may be carried out by utilizing either a calibration gas cylinde...

Страница 66: ...over the sensor head using the multi sensor adaptor to fit the sensor or if an Exd IP66 or Remote sensor head version screw the beaker on the remote sensor head M42 thread or M35 thread adaptor It sh...

Страница 67: ...sensor must be put into service mode This is carried out by pressing the following keys in this order within 6 seconds UP UP SPAN ZERO DOWN DOWN If the code is input correctly the sensor switches to t...

Страница 68: ...without saving the changes press UP for 3 seconds The STATUS LED will flash red for 3 seconds and then illuminate steady green g Replace the front of the sensor and close the hinges h At the GRM2 CO2...

Страница 69: ...espective items on the PCB 1 At the GDS sensor confirm the cell sensor is connected to J2 at the base of the PCB and the Analogue Sensor Trip Module RM2C 104 ATM2R is connected and supplies power via...

Страница 70: ...lines and regulations Annual checks and gas calibration are recommended It is also recommended that sensors are replaced every 3 years or as required Calibration frequency may be extended based on app...

Страница 71: ...elow 2 Monitor the output between 0V negative and VS positive 3 Adjust Pot VR201 to 0V or slightly positive 0 01 V is acceptable 4 Locate Pot VR202 which is used to calibrate the range span of the sen...

Страница 72: ...2 Styx infrared absorption sensor 24V DC plus serial comms Sample Pumps 4 8 12 or 16 pumps 24V DC 360mA Freeway 150m 492ft length max including all spur freeway 1 spur kit 4 way split max per SAMM All...

Страница 73: ...1 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 9 APPENDIX GRM2 CO2 GENERAL ARRANGEMENT PM2067...

Страница 74: ......

Страница 75: ......

Страница 76: ...2 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 GRM2 CO2 CONNECTION SCHEMATICS PS0748...

Страница 77: ......

Страница 78: ......

Страница 79: ......

Страница 80: ......

Страница 81: ......

Страница 82: ...3 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 ADC 104 GENERAL ARRANGEMENT PM2098...

Страница 83: ......

Страница 84: ...4 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 ADC 104 PANEL MOUNTING DETAILS PM2247...

Страница 85: ......

Страница 86: ...5 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 ADC 104 CONNECTION SCHEMATIC PS0753...

Страница 87: ......

Страница 88: ......

Страница 89: ......

Страница 90: ...6 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 GRM2 CO2 WITH ADC 104 INSTALLATION OVERVIEW PS0790...

Страница 91: ......

Страница 92: ...7 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 RM2C 104 ATM2R CONNECTION DETAILS PS0768...

Страница 93: ......

Страница 94: ...8 Operation Maintenance Manual Doc Ref MNGRM2CO2 REV 3 NETWORK SENSOR MOUNTING AND CONNECTIONS PS0778...

Страница 95: ......

Страница 96: ......

Страница 97: ...intenance Manual Doc Ref MNGRM2CO2 REV 3 Parasense Limited Phone 44 0 1452 724123 Email salesuk parasense com Web www parasense com Parasense Inc Phone 1 540 948 9919 Email sales parasense com Web www...

Отзывы: