1100-2294 Rev 1
32
On the devices screen there should be a green checkmark on the device that was
just commissioned signaling that the commission was successful.
7. Repeat these steps for each room on a floor and each floor in the building until all MVR-
300 devices have been commissioned. When all devices have been commissioned the
green “System Normal” splash will display on the Home Screen.
Figure 28 - Green checkmark appears
Figure 29 - System Normal screen
Содержание MVR-SC
Страница 1: ...1100 2294 Rev 1 1 ...