background image

 

Table of Contents 

 

Introduction ............................................................................................. 2

 

STINGER Specifications ........................................................................ 3

 

Table of Contents ................................................................................... 4

 

General Safety ....................................................................................... 5

 

Operational Safety .................................................................................. 6

 

Description of Features .......................................................................... 7

 

Vapor/Liquid Recovery Operations ......................................................... 9

 

Standard Recovery Hose Connections................................................. 10

 

Liquid Push-Pull Recovery Operations ................................................. 11

 

Liquid-Pull Recovery / Charging Method .............................................. 13

 

R-410A Recovery – Special Notes ....................................................... 14

 

Purging the STINGER .......................................................................... 15

 

DOT Recovery Cylinder Safety ............................................................ 16

 

Recovery Tips ...................................................................................... 17

 

Troubleshooting .................................................................................... 18

 

Schematic Diagrams ............................................................................ 19

 

STINGER Parts List ............................................................................. 20

 

STINGER Exploded View ..................................................................... 21

 

Compressor Parts List .......................................................................... 22

 

Compressor Exploded View ................................................................. 23

 

Warranty / Repair Procedures .............................................................. 24

 

 

Содержание High Performance Oilless Commercial Refrigerant Recovery...

Страница 1: ...High Performance Oilless Commercial Refrigerant Recovery Unit User Manual 2079 1130 Rev 6 May 2010...

Страница 2: ...air Decomposition products are hazardous Liquid contact may cause frostbite All refrigerant containers equipment and hoses are under pressure CAUTION Before operating this unit please read this manua...

Страница 3: ...tank full shutoff kit P N 2090 0091 Pressure Ratings Low Side design pressure 450 PSI High Side design pressure 550 PSI Temperature Operating Range 32 to 104 F 10 to 40 C Case Blow Molded High Impact...

Страница 4: ...d Recovery Hose Connections 10 Liquid Push Pull Recovery Operations 11 Liquid Pull Recovery Charging Method 13 R 410A Recovery Special Notes 14 Purging the STINGER 15 DOT Recovery Cylinder Safety 16 R...

Страница 5: ...inders are rated at 350 psi with a pressure relief set at 550 psi These cylinders should not be used with R 410A Only cylinders rated at 400 psi with the relief valve setting at 600 psi should be used...

Страница 6: ...icing otherwise an electrical shock hazard will be present when the unit is disassembled Use caution when connecting or disconnecting hoses Improper usage may result in refrigerant burns frostbite If...

Страница 7: ...Full Shutoff Cord Optional This optional accessory connects to a DOT recovery cylinder s overfill sensor and automatically shuts the STINGER off when the recovery cylinder reaches 80 of its liquid fil...

Страница 8: ...20 type plug that requires the use of a customer supplied power cord adapter 7 Outlet Port 3 Inlet Port Valve 6 Outlet Port Valve 2 Purge Valve 4 Inlet Port 11 Power Switch 8 Circuit Breakers 9 Locati...

Страница 9: ...pen the vapor valve on the DOT recovery tank 4 Use the rear mounted power switch to turn ON the STINGER The compressor will now begin to recover refrigerant Note When recovering liquid in rare instanc...

Страница 10: ...resulting in premature bearing failure Use the liquid push pull method or the liquid pull method to transfer large amounts of liquid refrigerant virgin or dirty Attention You must use an agency approv...

Страница 11: ...tubing design on the equipment does not allow for a solid column of liquid refrigerant to be formed STEPS The liquid push pull recovery method requires the use of a third hose In addition a sight glas...

Страница 12: ...inder and push the liquid out of the system and into the recovery cylinder 6 If a sight glass is being used you should watch it to determine when all of the liquid has been removed from the system 7 T...

Страница 13: ...e liquid pull method to transfer large amounts of liquid refrigerant virgin or dirty The liquid pull method is used to move a large amount of liquid refrigerant without the refrigerant passing directl...

Страница 14: ...R 410A just like R 22 Under certain conditions however because of R 410A s higher vapor pressure and density you will have to take the following precautions CAUTION USE ONLY DOT RECOVERY CYLINDERS AP...

Страница 15: ...After recovery operations are complete and with the unit still powered ON and running make the following control valve position changes refer to illustration below Turn the inlet valve blue knob left...

Страница 16: ...80 of its liquid full limit It is recommended that you use this cord for added safety If your STINGER is not equipped with an 80 tank full shutoff cord or if you are using a recovery cylinder that do...

Страница 17: ...erant use the liquid push pull recovery method This method is three times faster than recovering liquid directly Refer to the liquid push pull instructions on Page 11 When possible recover from both t...

Страница 18: ...in a few minutes pressure indication on HP gauge is high Purge valve is in Purge position during recovery and HP switch activates Discharge valve is not open and HP switch activates Recovery tank valv...

Страница 19: ...19 Schematic Diagrams...

Страница 20: ...ressure 1 9 2015 0140 Printed Circuit Board 110 120 VAC 1 9 2015 0160 Printed Circuit Board 220 VAC 1 10 2043 0160 Screen Guard Condenser 1 11 2043 0130 Screen Guard Fan 1 12 2014 0030 Circuit Breaker...

Страница 21: ...21 STINGER Exploded View...

Страница 22: ...Journal Bearing 1 2081 0260 9 Crank 1 2077 0940 10 Gasket 1 2081 0300 11 Crank Housing End Cover 1 2051 1920 12 Screw Cap M5 x 18MM 4 2081 0390 13 Shim 0 002 1 2081 0420 14 Shim 0 003 1 2081 0430 15...

Страница 23: ...23 Compressor Exploded View...

Страница 24: ...lacement Proof of purchase will be required in order to process the RGA OTC exchange units are processed as no charge orders If the unit is outside the 90 day OTC exchange period but within the 1 year...

Отзывы: