![BAC TrilliumSeries DFCV Series Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/bac/trilliumseries-dfcv-series/trilliumseries-dfcv-series_rigging-and-installation-instructions_3379915013.webp)
Removal of pre-cooler media
Empty pre-cooler frame
3. ATTACHMENT OF PRE-COOLER FRAME
Attach the empty pre-cooler frames to the dry unit, using the stainless steel hardware supplied. Place the different
pre-cooler frames such that the water distribution piping between sections can be connected, and the copper water
piping installed on the unit connects to the water flow meter of the pre-cooling sections.
Installation of empty pre-cooler frame at dry unit.
The pre-cooler sections are marked with the letters A, B, C and D to indicate their position on the V-type dry unit.
The dry unit is marked with the corresponding letters.
W W W . B A L T I M O R E A I R C O I L . E U
13
3 Section Assembly
3 Section Assembly
Содержание TrilliumSeries DFCV Series
Страница 1: ...DFCV Dry Cooler DFCV AD Adiabatic Cooler RIGGING AND INSTALLATION INSTRUCTIONS RDFCV ADv15EN...
Страница 10: ...8 fan unit 10 fan unit 12 fan unit W W W B A L T I M O R E A I R C O I L E U 10...
Страница 19: ...Installing screw on flange W W W B A L T I M O R E A I R C O I L E U 19 3 Section Assembly 3 Section Assembly...
Страница 26: ...W W W B A L T I M O R E A I R C O I L E U 26...
Страница 27: ...W W W B A L T I M O R E A I R C O I L E U...
Страница 28: ...W W W B A L T I M O R E A I R C O I L E U...
Страница 29: ...W W W B A L T I M O R E A I R C O I L E U...
Страница 30: ...W W W B A L T I M O R E A I R C O I L E U...
Страница 31: ...W W W B A L T I M O R E A I R C O I L E U...