Multi-Cell Installation

Refer to the submittal drawings for the proper orientation of each cell. The number and 
“face” are stenciled on the outer basin wall. Multi-cell cooling tower installations may 
employ flume boxes to equalize the water level in the basin of each cell. Follow directions 
in “Flume Box Installation” for details on their installation.

Multi-Cell Unit Assembly

1.  First, position the lower section of all cells on the unit supports and bolt in place. 

Some units come furnished with a flume box. If they do, use the flume box assembly 
procedure outlined in “Flume Box Installation” to connect the basins of the multi-cell 
units.

2.  Wipe any moisture and dirt from the perimeter mating flanges.
3.  Install foam seal tape (BAC part # 270175) supplied with the unit, as illustrated in 

Figure 3

, on 

page 5

 on the mating flanges of the lower sections in a continuous line. 

At each corner, allow 1” overlap.

4.  Complete assembly using the internal drift pin alignment guides:

 

Using drift pins in the drift pin guides provided (

Figure 7

), guide the top section on 

to the bottom section.

 

Match marks must line up as shown in 

Figure 3 

on 

page 5

.

 

Bolt the top sections onto the bottom sections as shown in 

Figure 4

 on 

page 5

 using 

the bolting channels in 

Figure 6

.

Flume Box Installation

1.  Position Cell #1 on the unit support and bolt in place.
2.  Wipe down the surface adjacent to the flume opening of Cell #1 to remove any dirt or 

moisture that may have accumulated during shipment.

3.  Wipe down the flanges on both ends of the flume box. On one end, apply a layer of 

flat butyl sealer tape (BAC part # 554000) around the face of the flange over the 
centerline of the holes. Do not overlap or stretch too thinly at the corners. When it is 
necessary to splice the sealer tape, be sure to press the two ends together to form a 
smooth, continuous strip. Apply a second layer of flat butyl sealer tape over the first 
layer following the same procedure. Refer to 

Figure 8, Detail A

.

4.  Using drift pins to align the bolt holes, place the flume box over the opening in the 

basin of Cell #1.

5.  Fasten into place as shown in 

Figure 9

. For basins with TriArmor

®

 Corrosion Protection 

System, backing plates are to be installed inside the basin and flume box opening (see 

Figure 10

Detail A

). Insert the 3/8” self-tapping screws or bolts in each hole from the 

flume box into the basin wall and backing strips (if applicable) as illustrated in 

Figure 

10

.

NOTE:

 Flume boxes furnished 

with units constructed with 
TriArmor

®

 Corrosion Protection 

System or stainless steel basins 
are assembled with stainless 
steel bolts, washers and nuts 
in lieu of self tapping screws. 
Before installing the nuts, apply a 
lubricant to the bolts to reduce the 
potential for seizing.

Figure 6. 

Upper and Lower Assembly - Drift Pin Guides

Drift Pin Guides

Figure 7.

 Bolting Channels

Bolting Channels

Содержание 3000 Series

Страница 1: ...RIGGING ASSEMBLY INSTRUCTIONS Series 3000 Cooling Tower Series 3000...

Страница 2: ...followed and to assure that all necessary equipment will be available beforehand Be sure to have a copy of the certified drawing available for reference If you do not have a copy of this drawing or i...

Страница 3: ...Assembly 6 Multi Cell Installation 6 Multi Cell Unit Assembly 6 Flume Box Installation 8 Optional Positive Closure Plate Installation 9 Fan Guard Installation 9 One Piece Fan Guard 10 Two Piece Fan G...

Страница 4: ...ning the bill of lading The following parts should be inspected Sheaves and Belts Gearbox Bearings Bearing Supports Fan Motor s Fan s and Fan Shaft s Float Valve Assembly s Water Distribution System F...

Страница 5: ...located to ensure an adequate supply of fresh air to the unit air intakes When units are located adjacent to walls or in enclosures care must be taken to ensure the warm saturated discharge air is no...

Страница 6: ...s Section Only Min W1 Spreader Bar Lifting Cable Spreader Bar Lower Spreader Bar Min W2 H Safety Slings Lifting Device Lifting Rig Lower Section Shown For multi cell units the lifting devices may be r...

Страница 7: ...ap 5 Complete assembly using the external bolt holes as guides for alignment Before lowering the upper section onto the lower section be sure to line up the bolt holes using drift pins as illustrated...

Страница 8: ...unit support and bolt in place 2 Wipe down the surface adjacent to the flume opening of Cell 1 to remove any dirt or moisture that may have accumulated during shipment 3 Wipe down the flanges on both...

Страница 9: ...9 Expanded View Figure 10 Elevation View 2 Layers of Flat Butyl Sealer Tape A A Cell 1 Cell 2 3 8 S T Screw 2 Layers of Flat Butyl Sealer Tape Flume Box Cell 1 Cell 2 2 Layers of Flat Butyl Sealer Tap...

Страница 10: ...plate remove the closure plate and gasket Retighten the flume box using the wing nuts and flat washers 2 Layers of Flat Butyl Sealer Tape B B Cell 1 Cell 2 Neoprene Gasket Positive Closure Plate 3 8...

Страница 11: ...the cooling tower is placed in operation Never step or walk on the fan guard Failure to follow these instructions may result in serious injury or death NOTE 1 Existing 3 8 stud and nut for guard moun...

Страница 12: ...Using six U bolt assemblies fasten the two halves of the fan guard together as illustrated in Figure 14 Detail B Locate the U bolt assemblies along the seam between the two guard halves per the X and...

Страница 13: ...ust be securely in place before the cooling tower is placed in operation Never step or walk on the fan guard Failure to follow these instructions may result in serious injury or death Four Piece Fan G...

Страница 14: ...3x 16 6 3 4 6 11 9 16 14 1 5 8 19 5 3 4 S3E XES3E 1424 14x 16 6 3 4 6 11 9 16 14 1 5 8 20 9 1 2 Table 5 Flow Control Valve NOTES FOR FIGURE 16 1 All piping shown by dashed lines is to be furnished by...

Страница 15: ...gned to clear the railing Adjust static lift as required 5 For units installed on vibration isolation rails provided by others flexible connections should be installed in the piping just before the to...

Страница 16: ...for Belt Tensioning Rigid Conduit Hole in Casing Panel Should be Large Enough to Accommodate Conduit Seal with Waterproof Sealant Rigid Conduit Outside Tower Turned Down to Junction Box or Safety Swit...

Страница 17: ...an Motor Face B Face A Face B Face A Face B Face A Face B Face A CT 4 CT 3 CT 2 CT 1 Fan Motor Rigid Conduit Hole in Casing Panel Should be Large Enough to Accommodate Conduit Seal with Waterproof Sea...

Страница 18: ...roper Voltage and Horsepower of Fan Motor Hole in Casing Panel Should be Large Enough to Accommodate Conduit Seal with Waterproof Sealant Rigid Conduit Outside Tower Turned Down to Junction Box or Saf...

Страница 19: ...ration and maintenance of this equipment WARNING Pacemaker danger Magnetic and electromagnetic fields in the vicinity of current carrying conductors and ENDURADRIVE Fan System motors can result in a s...

Страница 20: ...slot Slowly lower the fan onto the shaft until the fan hub is flush against the factory installed tangent locking collar Figure 29 7 Gradually tighten the bushing bolts in several passes to evenly sea...

Страница 21: ...Disk Figure 25 Attached to Blade Shanks Figure 26 Remove Shipping Restraint Hardware Figure 27 Lift Fan From Crate Model Number Bushing Type Bushing O D Hex Key Size Torque 1020 x U 4 10mm 50 Ft Lb 12...

Страница 22: ...sealer tape too thinly or overlap at the corners When it is necessary to splice the sealer tape be sure to press the two ends together to form a smooth continuous strip Apply a second layer of trapezo...

Страница 23: ...stalled by others After the controls are wired reinstall the cover plate on the terminal box A B C Terminal Box Pr e Wiring Factory Mounted Some field installation and wiring required Access Door Figu...

Страница 24: ...RS ICE THERMAL STORAGE EVAPORATIVE CONDENSERS HYBRID PRODUCTS PARTS SERVICES w w w B a l t i m o r e A i r c o i l c o m 7600 Dorsey Run Road Jessup MD 20794 Telephone 410 799 6200 Fax 410 799 6416 20...

Отзывы: