
Fig-S. 3-6
Fig-S. 3-5
Take Up Leader
Clamp Rail Lock
Pin
Fig-S. 3-7
Fig-S. 3-8
Top Leader
Quilt Top
Batting
Quilt Backing
Quilt Top
Batting
Top Rail
Batting Rail
Backing Rail
Page. 21
Section 3-7: Important!
Disengage the Clamp Rail
Lock Pin and tighten the Idler Rail Assembly by turning
the rail Counterclockwise a full rotation. Re-engage the
Clamp Rail Lock Pin ensuring the fabric is wrapped on
the Idler Rail. (Fig-S. 3-5)
Note:
Section 3-7 will make the Quilting Surface flat
and taut during quilting while the sliding rail operates.
Sections: 3-2, 3-6, and 3-7 will have to be repeated as
the quilt is rolled up on the Take Up Rail.
Section 3-6: Attach the Backing Leader to the Backing
Rail using the Fabri-Fast System and ratchet the remain-
ing fabric onto the rail. (Section 1: Fabri-Fast System
and Fig-S. 3-7)
Section 3-7: Similarly, attach the Top Leader to the Top
Rail using the Fabri-Fast System and ratchet the remain-
ing fabric onto the rail. (Section 1: Fabri-Fast System
and Fig-S. 3-8)
Section 3-8: The batting can be Fabri-Fasted onto the
Batting Rail if the batting is thin, otherwise tape and roll
it onto the rail to ease batting management. (Fig-S. 3-8)
Note:
The Take Up Rail and Batting Rail have no par
-
ticular direction of rotation and can rotate both ways
without effecting the frames performance.
Plug the power cords back in after the fabric installation
has been completed.
Содержание Momentum BLQM
Страница 1: ......