background image

©2020 Babcock-Davis, Inc. 

REV 8/2020 

 

Roof Hatch, Smoke Vent and Floor Door Safety Railings 

Installation, Operation & Maintenance 

              

                                                                                         Model(s): BSRA/BSRV/BSRT

 

 

 

 

 

6.

 

Tighten all mounting brackets to the counterflashing making sure that all brackets are square and level 
with each other. 

7.

 

Set torque to 29 ft/lbs. 

8.

 

Insert the 35” upright post (60) into the installed brackets and insert the 3/8”-16 x 3” bolts (70). 
Tighten the bolts using the 3/8”-16 nuts (20). 

9.

 

Repeat for all corner posts. 

Center Post, 

figure 4 

Center posts are included for roof hatch lengths greater than 8’. 

Before installation, note the position of the door. The center post should 
be placed opposite the hinge side of the roof hatch or floor door to protect 
the opening. 

1.

 

Temporarily assemble center brackets using temporary assembly 
holes in bracket halves and a 3/8”-16 nut and bolt. (See Figure 2 for example with corner brackets) 

2.

 

Assemble top rail and center post. Temporarily attach it to corner posts to verify location of center 
post bracket.  

3.

 

Assure that the bracket is sitting square and level on the counter flashing.  

4.

 

Mark the mounting holes on the counter flash and drill 1/2” diameter holes. Remove 3/8”-16 nut and 
bolt from bracket halves and top rail assembly.  

5.

 

Fasten to the center of the counter flashing using 3/8”-16 x 3/4” bolts, washers, and threaded nut 
plate.  

a.

 

If mounting holes were drilled, apply roofer’s caulk around hole in counter flashing. 

b.

 

Align and hold the threaded nut plate behind the counter flash.  

c.

 

Screw the 3/8”-16 x 3/4” bolts and washers through the bracket and into the threaded nut 
plate.  

6.

 

Tighten all mounting brackets to the counter flashing making sure that all brackets are square and level 
with each other.  

7.

 

Set torque to 29ft/lbs. 

8.

 

Insert the 35” upright post into the installed brackets and insert the 3/8”-16 x 3” bolts. Tighten the 
bolts using the 3/8”-16 nuts.  

9.

 

Repeat for all center posts. 

 

 

Figure 4 

 

Содержание BSRA

Страница 1: ...portation Storage o Inspect all shipments and materials for missing or damaged components and hardware o Railings may ship in multiple boxes depending on its size and exit configuration To help keep systems together the boxes will come banded together that form a full system o Material must be stored in a clean dry location Tools o Level o Marking Tool o Drill o 1 2 Drill Bit o Caulking o 3 16 All...

Страница 2: ... that the bracket is sitting square and level on the counterflash 4 Mark the mounting holes on each corner and drill 1 2 diameter holes Remove 3 8 16 nut and bolt 20 30 from the bracket halves 10 5 Fasten to the corner on counterflashing using 3 8 16 x 3 4 bolts 30 washers 40 and threaded nut plate 50 which is placed behind the counterflash for quick easy installation a If mounting holes were dril...

Страница 3: ... for example with corner brackets 2 Assemble top rail and center post Temporarily attach it to corner posts to verify location of center post bracket 3 Assure that the bracket is sitting square and level on the counter flashing 4 Mark the mounting holes on the counter flash and drill 1 2 diameter holes Remove 3 8 16 nut and bolt from bracket halves and top rail assembly 5 Fasten to the center of t...

Страница 4: ...ghten the set screws 5 Position the mid rail 21 center to center from the top rail 6 If necessary install end cap on single upright post Exit Option Self Closing Gate figure 6 This option is intended for roof hatch and floor door applications 1 Railing packages include a chain If installing a gate the chain is not used 2 Remove provided hardware pouch attached to the safety gate 3 Install safety g...

Страница 5: ...ion No Exit Two and Four Sided Rails This option is intended for smoke vents and equipment roof hatches when there is no required exit OPERATION Assure that all fasteners are tightened to the suggested torque The gate should fully open and close with no interference The roof hatch should operate without interfering with the safety railing MAINTENANCE o It is recommended that the springs in gate be...

Отзывы: