BABBITT LS7000 Скачать руководство пользователя страница 6

www.babbittinternational.com

 

Reference Manual 

 

2021

 

 

 

2. THEORY OF OPERATION

 

 

The LS7000 employs a radio frequency (RF) balanced impedance bridge circuit to detect if the probe is in 

 

contact with the material that is to be sensed. When material is not in contact with the probe, the bridge is 

 

balanced by turning the adjustment pot to find the threshold where the red led goes out. When material is in 

 

contact with the probe, the bridge becomes unbalanced and the comparing circuit realizes the change. This 

 

causes the relay to change state. 

3. INSTALLATION 

 
 
 
 
 
 

 

3.1 Inspection 

 

Carefully unpack the LS7000 from the shipping box and check each item against the packing list before 
destroying any packing material. Visually inspect for any damage that may have occurred during shipping. 
Please advise the factory or your local distributor of any damage.  

 

 

 

3.2 Bench Test 

 
*THIS IS AN EXCELLENT TIME TO BECOME FAMILIAR WITH THE TIME DELAY IF IT IS TO 
BE USED IN YOUR APPLICATION. (See calibration instructions, section 4.1 and 4.2) 
 
On the bench, hook up the appropriate power to L1 and L2. The operating voltage of the LS7000 is  

 

       marked on the power supply board. Hold the unit so that nothing is touching any surface and press the test 

 

       switch. When the test switch is depressed, the red led should come on. This simulates product touching the 

 

       probe. If a timing mode has been selected it will operate as if installed. 

 

NOTE: 

The timing mode can be adjusted when checking the unit, but the sensitivity adjustment 

MUST BE MADE AFTER 

the unit is installed where it will be used. 

 

 

3.3 Physical Installation 

 

1)   The LS7000 is installed into the vessel wall using a 1” NPT process connection. This can be either a  
 

threaded coupling or a tapped entry such as a flange. 

2)  The insulator should always extend at least 2” through the vessel wall.

 

 

3)  Always check for physical room around the location you have chosen to allow for installation. Allow 
 

3.25” turning radius to screw the probe in and clearance above for the length of the probe.  

 
 
 
 
 

CAUTION:

 

ALL INSTALLATION AND WIRING MUST CONFORM TO NEC AND ALL 

 

OTHER LOCAL ELECTRICAL CODES. TAKE SPECIAL CARE IN OBSERVING 

 

HAZARDOUS AREA SAFETY PROCEDURES. WE ASSUME NO LIABILITY FOR

 

IMPROPERLY INSTALLED OR WIRED UNITS. 

 

 

Содержание LS7000

Страница 1: ...LS7000 LEVEL SWITCH OWNERS MANUAL INSTALLATION CALIBRATION TROUBLESHOOTING WARRANTY P O Box 70094 Houston TX 77270 713 467 4438...

Страница 2: ...r problems arise during installation please contact Customer Service 1 800 835 8012 or 713 467 4438 8 00 a m to 5 00 p m CST US Failure to follow safe installation and servicing guidelines could resul...

Страница 3: ...tion 5 1 4 GA Drawing 5 3 INSTALLATION 6 3 1 Inspection 6 3 2 Bench Test 6 3 3 Physical Installation 6 3 4 Removing the Electronics 7 3 5 Typical Applications and Wiring Diagrams 8 4 CALIBRATION 14 4...

Страница 4: ...rical Power 115 VAC 15 50 60 Hz 2 watts standard 12 VDC 24 VDC or 230 VAC optional Output 2 Form C contacts DPDT relay 5 amp resistive At 125 250 VAC 30 VDC Fuse On board 250 mA 125 volts Fail Safe Se...

Страница 5: ...www babbittinternational com Reference Manual 2021 5 1 3 Ordering Information 1 4 GA Drawing...

Страница 6: ...2 On the bench hook up the appropriate power to L1 and L2 The operating voltage of the LS7000 is marked on the power supply board Hold the unit so that nothing is touching any surface and press the t...

Страница 7: ...dry materials mount the LS7000 in the top of the vessel whenever possible This allows you to lengthen the probe if necessary b Avoid mounting the LS7000 near the product inlet vent return lines dust c...

Страница 8: ...ONTACTS SUPPLY VOLTAGE NOTE EACH LS7000 POWER SUPPLY IS INTENDED FOR ONLY ONE SUPPLY VOLTAGE THIS VOLTAGE IS PRINTED ON THE POWER SUPPLY BOARD FOR 115 VAC OR 230 VAC UNITS HOOK UP THE HOT LEAD TO L1 A...

Страница 9: ...www babbittinternational com Reference Manual 2021 9...

Страница 10: ...www babbittinternational com Reference Manual 2021 10...

Страница 11: ...www babbittinternational com Reference Manual 2021 11...

Страница 12: ...www babbittinternational com Reference Manual 2021 12...

Страница 13: ...www babbittinternational com Reference Manual 2021 13...

Страница 14: ...E S3 and S4 also select fail safe high level FSH or fail safe low level FSL 2 Select the timing range using S1 and S2 as shown on the chart below next page 3 Adjust the time adjustment potentiometer c...

Страница 15: ...djustment potentiometer clockwise CW until it comes on 3 Turn the sensitivity adjustment pot counter clockwise CCW until the Red LED just goes out This sets the unit to its maximum sensitivity If in y...

Страница 16: ...go out If it does repair replace or clean antenna probe If LED does not go out replace electronics Bad sensing card Repair or replace card Unit triggers when material Improper mount of probe Contact...

Страница 17: ...applied to any components which have been damaged by improper installation use exposure to unusual atmospheric conditions or components which have been misused abused damaged by neglect or accident Th...

Отзывы: