b4 Adventure 4010 Holly Street Unit 16 • Denver Colorado 80216 • 1-844-834-4334 QUESTIONS?
[email protected] · www.b4adventure.com 303-339-0482 - DC:080818
5
3. ATTACHING YOUR ZIPLINE
The installation should only be performed by an adult and in accordance with these instructions. Your
course cable comes with protective tubing for the bark of your tree.
•
STEP 1:
Take the main cable and wrap the looped end around your Start Point tree (Figure 1) and thread
the un-looped end and the rest of the cable through the looped eye and set at a height from the guideline
on page 3.
• Install Tip Option: Determine your Start Point and Finish Point heights. Use three of the six small nails
(spaced 2 In. apart) for each tree to keep the cable from slipping down the tree during installation.
Note: Do not put the nails into or through the cable.
• Thread the cable, using the blunt, un-looped end through the trolley (Figure 2) between the two pulleys
and the grip bar. Now wrap the un-looped end around your Finish Point tree at the initial finish point height
of 78 In. and rest the cable on the three small nails - see tip above.
SLOPING COURSE ATTACHMENT HEIGHT GUIDELINE
General Set Up:
Start point Height for Course (space between trees)
Course Length:
100 Ft. 90 Ft. 80 Ft. 70 Ft. 60 Ft. 50 Ft. 40 Ft. 30 Ft.
End Point
Initial Set Up
Start Point (In.):
132 In. 126 In. 120 In. 114 In. 108 Ft. 102 In. 96 In. 90 In.
78 In.
Maximum Slope
Height Reduction:
54 in. 48 In. 42 In. 36 In. 30 In. 24 In. 18 In. 12 In.
*Every course is different, examine the course clearances so the riders feet do not drag near the end of the course
Start Point
Finish Point
24 inches
of drop