manualshive.com logo in svg
background image

1.  Remove 1/4-20 nuts from installed YKB 

anchor kit with a socket. Keep the hardware 

to reuse in the next step.

2.  Line up then place base over installed 1/4-

20 nuts.

3.  Secure to anchor bolts with the 1/4-20 nuts 

and lockwashers provided with the YKB 

Anchor kit using a socket.

Base & Tenon Installation

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

RELEASED DATE

09/03/2021

REFERENCE NUMBER

INS-2850-00

4. 

Seal as per NEC with waterproof silicone 

sealant (not included).

Yukon Bollard

Installation Instructions

If the fixture has a receptacle.

7.  Secure receptacle cover by tightening #6-32 set 

screw using a 7/64” allen wrench.

6.  Attach receptacle to installed anchor base 

with (4) #10-32 stainless steel countersunk 

screws at the base using a 1/8” allen wrench.

5. 

Pull primary branch circuit wiring and any 

additional dimming controls or other wiring  

necessary for installation (not included). 

Attach ground from branch circuit to ground 

lead on the anchor base. Place connectors 

inside of the housing. 

(Please refer to page 

4 for wiring diagram.)

Отзывы: