8. Remove temporary cover and pull out primary
120V, branch circuit wiring.
Finished grade
Wire nuts must
clear opening
6”
min.
9. Access primary 120V, branch circuit wiring
inside housing. Make watertight connections
using waterproof wire connectors (not
included). Wire connectors must clear
opening. Insert fixture, wiring and connections
into housing.
See wiring diagram.
In-Ground Installation Instructions
10. Mount faceplate to collar using two (2) #8-32
flat head screws (provided) with a 9/64” allen
wrench.
LINE
GROUND
GROUND
FIXTURE
COM
LINE
COM
WIRING DIAGRAM
Pull branch circuit wiring. Make watertight
connections from branch circuit wiring to
fixture leads using waterproof wire connectors
(not included) in splice location as per NEC.
UL Listed splice location required. Connect
incoming green ground wire to ground wire
from fixture.
See wiring diagram.
All line voltage connections must be made
in compliance with the National Electrical
Code. Failure to do so will void warranty.
RELEASE DATE
08/16/2022
REFERENCE NUMBER
INS-2873-00
40429 Brickyard Drive • Madera, CA 93636 • USA
559.438.5800 • FAX 559.438.5900
www.bklighting.com • [email protected]
B-K LIGHTING
IMPORTANT SAFETY INFORMATION LISTED ON REVERSE
READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS
Fixture Relamping
This product is available with field replaceable components. Exclusive interchangeable OPTIKITS and modular
LED components with quick disconnects simplifies upgrades and maintenance when necessary.
1. Remove faceplate from collar using two (2)
#8-32 faceplate screws with a 9/64” allen
wrench.
2. Remove fixture from collar.
3. Loosen three (3) #8-32 set screws with a 5/64”
allen wrench to remove cap from fixture body.
HUME
UPLIGHT - INTEGRAL
Standard Installation
WIRING DIAGRAM (0-10)
FIXTURE
HOT
NEUTRAL
GROUND
0-10V +
0-10V -