background image

RELEASE DATE

08/16/2022

REFERENCE NUMBER

INS-2873-00

40429 Brickyard Drive • Madera, CA 93636 • USA

559.438.5800 • FAX 559.438.5900 

www.bklighting.com • [email protected]

B-K LIGHTING

IMPORTANT SAFETY INFORMATION LISTED ON REVERSE

READ, FOLLOW, AND SAVE ALL SAFETY AND INSTALLATION INSTRUCTIONS

5.  Align holes to final installation orientation. 

Arrows on temporary cover point towards 

screw location on faceplate for alignment 

purposes.

 

NOTE: Do not remove temporary cover until 

installation of faceplate.

Finished grade

12”

Finished grade

8 3/4”

LINE

12V

FIXTURE

COM

Remote

Transformer

COM

Screws on faceplate will 

align with alignment 

arrows on temporary 

cover

Stability flange

Rebar or stake (by others)

Pea gravel or sand

Finished grade

Concrete

Stability flange

Rebar or stake (by others)

Pea gravel or sand

Finished grade

Concrete

Finished grade

Concrete

Wire nuts must 

clear opening

6” 

min.

Finished grade

12”

1.  Excavate trench according to designed 

lighting plan 12” deep and 15” wide suitable 

for the fixture housing. 

2. Supply remote wiring necessary for 

installation.

3.  Slide stability flange onto housing.

 

NOTE: Product is supplied with a 

stability  flange to anchor fixture and aid in 

installation

.

4.  Loop minimum of 6” wire inside housing to 

allow for fixture service. Place fixture in hole.

 NOTE: 

 

Do not remove temporary cover! 

Fixture Installation Flush Mount

6.  Per DIG-IT Guide, backfill the gap between 

the bottom of housing and bottom of hole with 

sand or pea gravel for drainage.

 

NOTE: The mounting collar must be flush to 

finished grade. Use stability flange to aid in 

installation as shown. Fixture is provided with 

5ft leads.

Finished grade

8 3/4”

2 window
faceplate 
shown

Finished grade

8 3/4”

LINE

12V

FIXTURE

COM

Remote

Transformer

COM

Optical opening on 

faceplate will align with 

alignment arrows on 

temporary cover

Optical opening on 

faceplate will align with 

alignment arrows on 

temporary cover

Stability flange

Rebar or stake (by others)

Pea gravel or sand

Finished grade

Concrete

Stability flange

Rebar or stake (by others)

Pea gravel or sand

Finished grade

Concrete

Finished grade

Concrete

Wire nuts must 

clear opening

6” 

min.

Optical opening on 

faceplate will align 

with alignment 

arrows on temporary 

cover

Stability Flange

Rebar or Stake (By Others)

Pea Gravel or Sand

Finished Grade

Concrete

7.  Fill with soil, then compress. Layer paver sand 

as required for paver installation, then install 

pavers. Pavers may need to be cut to fit around 

housing.

 

HUME

UPLIGHT - INTEGRAL

Standard Installation

Soil Prep

Conduit

trench

B.  Dig hole 15” wide and 12” deep.

Conduit

Trench

Excavated 

for Housing

C.  Prep soil according to DIG-IT Guide.

A.  Determine Soil Type by referencing DIG-IT 

Guide. Prep soil according to DIG-IT Guide.

In-Ground Installation Instructions

Содержание HUME

Страница 1: ...mping turn off power at fuse or circuit breaker before service The use of accessory equipment not recommended by the manufacturer or installed contrary to instructions may cause an unsafe condition Th...

Страница 2: ...ng inside housing to allow for fixture service NOTE Do not remove temporary cover Screws on faceplate will align with alignment arrows on temporary cover 3 Place housing into hole Surface mount collar...

Страница 3: ...Conduit trench B Dig hole 15 wide and 12 deep Conduit Trench Excavated for Housing C Prep soil according to DIG IT Guide A Determine Soil Type by referencing DIG IT Guide Prep soil according to DIG I...

Страница 4: ...wire inside housing to allow for fixture service Place fixture in hole NOTE Do not remove temporary cover Fixture Installation Flush Mount 6 Per DIG IT Guide backfill the gap between the bottom of hou...

Страница 5: ...wire to ground wire from fixture See wiring diagram All line voltage connections must be made in compliance with the National Electrical Code Failure to do so will void warranty RELEASE DATE 08 16 202...

Страница 6: ...ector upwards and off board Fragile Do not pull on connector or wiring Handle with care 9 Tighten two 2 4 40 screws using Phillips screwdriver to secure optic holder over LED module 4 Remove optic by...

Страница 7: ...the cap to remove 7 Reconnect heatsink assembly to driver assembly via quick disconnect Quick disconnect tucks into space underneath heatsink 4 Lift lever on the wago connector to remove LED leads 5...

Отзывы: