![B+B Sensors 1M Скачать руководство пользователя страница 54](http://html.mh-extra.com/html/b-b-sensors/1m/1m_operating-manual_460614054.webp)
OPEARTING MANUAL
Technische Änderungen vorbehalten
B+B Thermo-Technik GmbH | Heinrich-Hertz-Str. 4 | D-78166 Donaueschingen
0141 0315-100 17.08.2015
Fon +49 771 83160 | Fax +49 771 831650 | [email protected] | bb-sensors.com
54 / 88
4.1.5
Cable Assembling
The cable gland M12x1,5 allows the use of cables with a diameter of 3 to 5
mm. Remove the isolation from the cable (40 mm power supply, 50 mm signal
outputs, 60 mm functional inputs). Cut the shield down to approximately 5 mm
and spread the strands out. Extract about 4 mm of the wire isolation and tin the
wire ends.
Place the pressing screw, the rubber washer and the metal washers of the
cable gland one after the other onto the prepared cable end. Spread the
strands and fix the shield between two of the metal washers. Insert the cable
into the cable gland until the limit stop. Screw the cap tight.
Every single wire may be connected to the according screw clamps according
to their colors
Use shielded cables only. The sensor shield has to be grounded.