
Swimming-Pool
Technical room
Chemical treatment
Blowing
By-pass
Heat Pump
Drain of the
condensates: insert
the plastic elbow in
the hole of
evacuation of the
bottom and connect
the pipe
if need.
Hydraulic connections:
To
respect imperatively
Connection is carried out with a by-pass located on
the circuit of filtration, upstream appliances of the
chemical treatment of water.
Connect intake/outlet water PVC pipes DN50 to the
openings of the machine in following the inlet / outlet
indications (grease the worms before screwing)
Filter
1
3
Содержание BP-50WS-C
Страница 1: ...Directions for installation and maintenance...
Страница 6: ...6...
Страница 11: ...11 Electric diagram...