3.  To  activate  the  Bonus,  introduce  a  valid  coin  that  will  be  accepted.  If  the 

validator

 rejects it, introduce another coin. 

4.  Put  dipswitch  SW4  OFF.  If  the  programming  was  correct,  the  solenoid  on  the 

acceptance  gate  will  make  a  long  “click”.  If  the  programming  was  not  correct, 

the solenoid on the acceptance gate will 

NOT

 “click” and you will have to repeat 

the process from the start. 

The process to follow to 

deactivate

 wide tables / bonus is as follows: 

1.  Place the SW1, SW2, SW3 dipswitches with corresponding configuration. 

2.  Put  dipswitch  SW4  ON.  The  electromagnet  on  the  acceptance  gate  will  make a 

short “click”. 

3.  Place dipswitch SW4 in the OFF position.  The electromagnet  on the acceptance 

gate will make a long “click”. 

4.2

 

Parameters that are configurable using Tools. 

As already mentioned in this manual, the modular validator AC-DSP is characterized by its high 

configurability by the user. 

Below  are  all  parameters  that  can  be  configured  depending  on  the  particular  needs  of  each 

client, using the Azkoyen tools available. 

 

GENERAL PARAMETERS 

 

PARAMETER 

DESCRIPTION 

 

Recuperation code 

Assign code to the acceptance gate 

 

Reject code 

Assign code to the rejected coins 

 

Inhibition/  Service  request  level 

(pin 6). 

**

 

Assign voltages 5/0 volts to the logic levels 1/0  

 

Activate / Deactivate Wide tables 

 

 

Activate / Deactivate Bonus 

 

 

Output signal levels. 

**

 

Assign voltages 5/0 volts to the logic levels 1/0  

 

Tokens 

Assign values of the tokens 

Содержание A6-D2S

Страница 1: ...Protocol Modular AC DSP V1_version Feb 2011 1 Modular AC...

Страница 2: ...ERATION 6 3 1 Selecting the operating mode 6 3 2 Validator AC DSP in Parallel mode 7 3 3 Validator AC DSP in Timer mode 8 3 4 Validator AC DSP in Credit mode 11 4 MODIFIABLE OPERATING PARAMETERS 13 4...

Страница 3: ...3 Pinout in parallel mode 7 Table 4 Pinout Timer mode 8 Table 5 Pinout for Credit mode 11 Table 6 Modifiable parameters using switches 13 Table 7 Configurable Parameters 17 Index of Figures Figure 1...

Страница 4: ...iled information on this point consult paragraph 1 2 of the manual Technical Information In this manual the general term AC DSP will refer to any of the above validators For full information on the te...

Страница 5: ...or is through pins 1 GND and 2 Vdc for this connector The function of each of the pins will vary depending on the operating mode selected by the user See section 3 Operation for details 2 2 Connector...

Страница 6: ...wered through the J1 connector for communication between the Validator and the Azkoyen tools 3 OPERATION 3 1 Selecting the operating mode To select the desired operating mode use the dip switches on t...

Страница 7: ...odule Pins Function Notes Pin 1 GND Pin 2 12 24 Vdc Minimum 10 Vdc Maximum 27 Vdc Pin 3 Output 5 Open collector transistor NPN Pin 4 Output 6 Open collector transistor NPN Pin 5 Output 7 Open collecto...

Страница 8: ...Notes Pin 1 GND Pin 2 12 24 Vdc Minimum 10 Vdc Maximum 27 Vdc Pin 6 Input Inhibition coins request service Pins 3 4 5 7 8 9 and 10 Output Available for output of Operating time Counter Warning signal...

Страница 9: ...inimum of 50 milliseconds This pin has to go back to the inactive state during a minimum time of 50 milliseconds to make the sale of the next signal If the introduced amount was higher than the price...

Страница 10: ...dator will not work Once the user requests the service the validator will give a signal of 60 seconds to the corresponding pin A new service request is required to obtain the 60 remaining seconds In t...

Страница 11: ...r Available credit Table 5 Pinout for Credit mode These validators offer two operating modes Working with continuous pulses When the programmed price is reached or exceeded the validator automatically...

Страница 12: ...ds The user introduces 2 Until the user requests the service on 6 pin the validator will not work Once the user requests the service the validator will give 5 pulses to the corresponding pin A new ser...

Страница 13: ...Tables 1 0 1 Bonus 0 1 1 Table 6 Modifiable parameters using switches To programme the parameters with dipswitches follow the steps below 1 Place SW3 SW2 and SW1 dipswitches with the parameter settin...

Страница 14: ...oken 2 1 Place the dipswitches to be programmed for token 1 or token 2 2 Put dipswitch SW4 ON The electromagnet on the acceptance gate will make a short click 3 Introduce a minimum of 25 tokens that y...

Страница 15: ...ill make a short click 3 Place dipswitch SW4 in the OFF position The electromagnet on the acceptance gate will make a long click 4 2 Parameters that are configurable using Tools As already mentioned i...

Страница 16: ...ce request Continuous with Service request Price of service Time of service Pin of timer Available credit pin Counter activated YES NO Pin counter default pin 8 Time ON of counter Time OFF of counter...

Страница 17: ...a configurable parameter by the user it may be useful know factory default settings LOGIC LEVEL 0 From 0 volts to 0 7 volts LOGIC LEVEL 1 From 4 volts to 5 volts 5 AZKOYEN TOOLS 5 1 HEUS The HEUS use...

Страница 18: ...To know the details of the implementation and management of the HEUS consult the specific manual available on the Azkoyen website http sat azkoyen com 5 2 TL20 The TL20 is a hardware tool that is used...

Страница 19: ...ning of the validator as it simulates the behaviour of a machine There are numerous configuration switches as well as a Display to setup different working modes in the validator Figure 7 IS21 A To kno...

Отзывы: