© 2017
Order #XXXXX
SETUP INSTRUCTIONS
If you would like to tell us about your experience with your setup instructions please email us at
MOD-1701 Backlit Counter
Steps:
1) Connect horizon
tals [1,1A] between verticals [2,2A],
sliding
Infill
between verticals.
See
CEI-110 Corner Connection
detail.
2) Attac
h horizontal [5] between verticals [2A,4], sliding
Infill
between verticals, then secure with horizo
ntal [5A].
3) Attach horizont
al [6] between verticals [2,3], sliding
Infill
between verticals, then secure with horizon
tal [6A].
4) Attach horizontal
s [7,7A] between verticals [3,4].
5) Connect Door to vertical [3].
See
Door Connection
detail.
6) Connect shelf supports to Velcro on inside of Infills,
place
Shelf on top of supports
.
7) Plac
e Counter Top on top of as
sembled Counter base.
8) Attach lights and transformer. See
Light
details.
9) Install SEG Graphic to front of assembled light frame.
See
SEG Graphic Installation
detail.
Item
1/1A
2/2A
3
4
5/5A
6/6A
7/7A
Qty.
1/1
1/1
1
1
1/1
1/1
1/1
Description
22.1654”w CEI110 Horizontal Extrusion
38”h CEI110 Vertical Extrusion w/ attached S10
38”h S44 Vertical Extrusion w/ Door Hinge
38”h S44 Vertical Extrusion w/ Door Stop
16”w Z45 Horizontal Extrusion
16”w Z45 Horizontal Extrusion
18.5”w Z45 Horizontal Extrusion
Completed Assembly
Counter Top
Shelf
shelf suppoprt
shelf suppoprt
shelf suppoprt
shelf suppoprt
BACK VIEW
1
1A
2
5
3
6
4
7A
7
5A
2A
2
2A
Infill
Door
Infill
Infill
Door
Hinge
Hinge
Pin
Slide Pin into
Hinge attached
to Vertical.
Slide Door
Hinge over Pin.
Door Connection
*
+
+
+
-
-
-
to power
Lights
Male
Male
Female
Female
48W - 2A
Light to Light Connection
Light to Transformer Connection
Graphic Removal
To remove the graphic from
the frame, locate the fabric
pull tab. Gently pull up on the
tab to remove the fabric.
Step 1
Insert corner A. Turn edge of
graphic so silicon welt is
perpendicular to face of
graphic. Insert narrow side
of welt with fabric to outside
into the channel. Repeat for
other side of this corner.
Step 2
Repeat Step 1 for opposite
corner C, then insert corner
B, followed by corner D, to
complete the installation of
the corners.
Step 3
Once all corners are inserted,
press one silicon edge into
channel from corners and
work toward the center.
Make sure welt is fully inserted
into channel. Continue until
all sides are done. Smooth
out edges of graphic.
SEG Graphic Installation
It is important to first insert
graphic into each alternate
corner then to the sides of
the frame. If this is not done,
graphic will not fit into the
frame correctly.
Corner A
Corner D
Corner B
Corner C
6A
*
*
CEI-110 Corner Connection
*
1) Insert
TSRV2
and
A1
Brackets
into grooves of Extrusion.
2) Slide connecting Extrusion over
exposed ends of brackets.
3) Use Set screws to secure
Extrusions.
TSRV2
Bracket
A1
Set
Screw