background image

E2

UNPACKING

The following items should be included in your purchase.

• 

Model AUD100/110

• 

Model AUD15 (depending on the model number selected)

• 

User’s manual (this manual)

 

CP-UM-5640JE

• 

Effective operation time label

 

„

Labels

 

l

Effective operation time label

An effective operation time label is included with the 

AUD100/ 

110

. Use it for maintenance management of the 

AUD15

.

取扱説明書をよく読み、正しくお使いください。

有効使用期限管理ラベル

バーナNo.

有効使用期限

形 番/名 称

Effective operation time label

Effective operation time

Model/Name

Burner No.

before using and use it correctly.

Please read instructions carefully

9735-001-02

  Handling Precautions

• 

In the “Effective operation time” column, write the esti-
mated date when the total usage time will reach 25,000 
hours, as calculated from burner operating times.  If this 
period is longer than 5 years, write the same date shown 
on the expiration date label, and refer to that date for 
maintenance purposes.

 

l

Thermolabel

A thermolabel is attached to the AUD15. 

Cool the equipment by ventilating so that the 

white parts of the thermolabel do not change color to black.

Refer to the thermolabel to help ensure that the allowable am-

bient temperature is not exceeded.

INSTALLATION AND WIRING

 

WARNING

Do not allow this device to receive ultraviolet rays (ex-

cept from the burner flame), gamma rays, or x-rays. A 

false flame signal will endanger combustion safety. 
•  Sources of ultraviolet rays, gamma rays, and x-rays: 

Furnace refractories heated to 1371 °C or more, sparks 

from an ignition transformer or arc welder, gas lasers, 

sun lamps, sterilization lamps, flashes of light, diffrac-

tion analyzers, electron microscopes, X-ray machines, 

high-voltage vacuum switches, high-voltage capaci-

tors, radioactive isotopes, etc.

 

CAUTION

Do not install where exposed to any of the following:
•  Atmospheres that interfere with ultraviolet rays be-

cause of vapor, sooty smoke, oil mist, dust, etc.

•  Certain chemicals, petroleum solvents, or vapors (am-

monia, sulfur, chlorine, ethylene compounds, acids, or 

corrosive gases).

•  Prolonged vibration
If gas cannot be allowed to leak out of the furnace 

through the monitoring pipe, take appropriate counter-

measures.  A sealed adapter and a lens unit have an air 

purging connection port.
If the ambient temperature exceeds the specifications, 

use air purging to cool down the unit. Also, use the 

sealed adapter (sold separately) with the unit.

  REPLACEMENT/OPTIONAL PARTS (on page E6)

 

„

Inserting the model AUD15 into the model 
AUD100/110

First, align the   mark on the AUD15 with the notch on the 

AUD100/110. Then insert the AUD15 all the way into the 

AUD100/110.

Notch

mark

AUD100/110 socket

AUD15 tube unit

Insert the signal pins 

on the left and right 

of the projection.

1

3

2

Signal pins

(gold-plated)

  Handling Precautions

• 

Never touch the light-receiving glass surface.

• 

Insert the tube gently to avoid damage.

 

„

Wiring

WARNING

Before removing, mounting, or wiring the AUD100/110, be 

sure to turn off the unit and all connected devices. Failure 

to do so might cause electric shock.
For the AUD100, connect the blue signal lead to terminal 

F on the burner controller, and the white lead to terminal 

G.  For the AUD110, connect terminals F and G to terminals 

F and G on the burner controller, respectively. Before the 

power is turned on, check that the wiring is correct. If the 

power is turned on with incorrect wiring, the AUD15 will 

be damaged and a false flame signal will be generated, 
endangering combustion safety.
For the AUD100

AUD100

Burner controller

Blue (F)

White (G)

F

G

AUD100

Burner controller

Blue (F)

White (G)

F

G

Right

Wrong

For the AUD110

AUD110

Burner controller

F

G

AUD110

Burner controller

F

G

F

G

F

G

Right

Wrong

CAUTION

Carry out the wiring work in conformity with the speci-

fied standards.
Connect the power to the equipment as the last step. 

Connecting the power sooner may result in electric shock 

or damage.
Be sure to route the flame signal wires of this device 

separately from high-voltage ignition transformer cables 

and power cables. Do not put them in the same wiring 

conduit.

110, 115, 120

Содержание AUD100 Series

Страница 1: ...15 AUD100 110 AUD15 AUD15 25 000 5 UV UV AUD100 110 AUD15 AUD100 AUD15 AUD100 AUD110 2 AUD100 110 AUD100C100 UV AUD15 AUD100C1000 A15 UV AUD15 AUD110C100 UV AUD15 AUD110C1000 A15 UV AUD15 0 D T AUD110...

Страница 2: ...efore using and use it correctly Please read instructions carefully 9735 001 02 25 000 5 AUD15 X X 1371 J6 AUD100 110 AUD15 AUD100 110 AUD15 AUD100 110 AUD15 1 3 2 AUD100 F G AUD110 AUD110 F F G G AUD...

Страница 3: ...M3 5 7 3 7 mm 0 98 N m F G AUD110 AUD15 100k F G DC G F F DC160 220 V G DC160 220 V DC F G AUD100 1 3 F G 1 AUD15 50 80A AUD100 110 AUD100 110 AUD100 110 AUD100 110 AUD100 110 AUD100 110 AUD100 110 F...

Страница 4: ...AUD100 110 50 80A AUD100 110 AUD100 110 120 FSP136A100 FSP136A FSP136A AUD15 AUD100 110 AUD100 110 FSP136A100 AUD100 110 2K AUD100 110 AUD15 AUD100 110 1 4 1 25 000 5 UV UV AUD15 AUD15 AUD100 110 AUD...

Страница 5: ...AUD15 AUD100 110 AUD15 AUD100 110 AUD15 J2 AUD100 110 AUD100 G1 2 AUD110 AUD100 110 20 120 40 90 RH AUD100 AUD110 120 g AUD15 140 g 120 g AUD15 140 g DC500 V 50 M AUD15 IP65 JIS C 0920 IEC 60529 35 kP...

Страница 6: ...10 10 V 2010 2020 Azbil Corporation All Rights Reserved AUD110C100 AUD15 mm 60 140 90 40 64 76 G1 2 52 G1 AUD15 F G M3 5 AUD100C100 AUD15 mm 105 55 64 41 G1 2 G1 40 24 1800 AUD15 AUD15C1000 81447479 0...

Страница 7: ...ination with Azbil Corporation s burner controllers CAUTION Installation wiring maintenance inspection adjustment and the like of the AUD15 and AUD100 110 should be car ried out only by a trained and...

Страница 8: ...r chlorine ethylene compounds acids or corrosive gases Prolonged vibration If gas cannot be allowed to leak out of the furnace through the monitoring pipe take appropriate counter measures A sealed ad...

Страница 9: ...pipe 50 to 80 A Pilot burner Main burner AUD100 110 zMounting angle Mount the AUD100 110 so that it monitors the burner at an angle from above Handling Precautions If the AUD100 110 monitors from bel...

Страница 10: ...and air pressure a pilot flame detected by the flame detector will reliably light the main burner For the procedure of the pilot turndown test follow the instructions in the burner controller manual o...

Страница 11: ...h the light receiving glass surface zHow to replace the nut packing If the nut packing is damaged replace it according to the pro cedure below 1 Remove the AUD100 110 from the monitoring pipe 2 Hold t...

Страница 12: ...ion s burner controllers REPLACEMENT OPTIONAL PARTS sold separately Model No Description AUD15C1000 Tube Unit Ultraviolet photoelectric tube 81447479 001 Nut Packing 81403159 Seal adapter FSP100R15000...

Отзывы: