background image

E5

 

l

Check of the exterior

Check the following regularly.

• 

Check that the service life of the AUD15 has not expired. If it 

has, replace the AUD15 with a new one.

• 

Check the ambient temperature. The thermolabel can be 

used to obtain a rough estimate of the ambient temperature. 

If the temperature exceeds the specifications, cool down the 

device.

• 

Check that the nut packing is not damaged. If it is, replace it 

with new packing.

• 

Check that there is no corrosion or damage of the cap nut, 

body, terminal block, or lead wires of the AUD100/110. If 

any corrosion or damage is found, replace the socket with a 

new one.

• 

Check that AUD15 pins and pin base surface, the 

AUD100/110 socket holes, and AUD110 terminals are not 

dirty. Replace any dirty component. 

 

l

How to clean the model AUD15

Periodically clean the light-receiving glass surface of the 

AUD15

 using the following procedure:

(1)  Remove the 

AUD15

 and 

AUD100/110

 from the monitor-

ing pipe.

(2)  Clean the light-receiving glass surface using a cotton swab 

or the like.

(3)  Remount the 

AUD15

 and 

AUD100/110

 on the monitoring 

pipe.

 

l

How to replace the model AUD15

(1)  To avoid damage to the 

AUD15

, hold the 

AUD100/110

 

socket unit and pull it out carefully.

(2)  Insert a new AUD15 into the socket (refer to “Inserting 

the AUD15 into the AUD100/110” on page E2).

(3)  Attach a new effective operation time label and expiration 

date label.

  Handling Precautions

• 

Never touch the light-receiving glass surface.

 

l

How to replace the nut packing

If the nut packing is damaged, replace it according to the pro-

cedure below.
(1)   Remove the AUD100/110 from the monitoring pipe.
(2)  Hold the main part of the 

AUD100/110

 and, while rotat-

ing the cap nut, move it toward the G 1/2 thread in the 

case of the 

AUD100

, or toward the terminal block in the 

case of the 

AUD110

. This will detach the nut packing so 

that it can be replaced.

(3)  Return the cap nut to its original position, and insert the 

new nut packing inside the nut, pushing it with an object 

that is not sharp to avoid damage.

(4)  Remount the AUD100/110 on the monitoring pipe.

SPECIFICATIONS

Item

Specifications

Power supply From the burner controller device
Ambient 
temperature

-20 to +120 °C

Ambient 
humidity

40 °C, 90 % RH max.

Mass

AUD100

AUD110

Approx. 120 g

(with the AUD15: Approx. 140 g)

Approx. 120 g

(with the AUD15: Approx. 140 g)

Insulation 
resistance

50 MΩ min. by 500 V DC megger 

( between each lead wire and the metal part of socket 

when the AUD15 is removed)

Protective 
structure

IP65 (JIS C 0920/IEC 60529) with pipes and wires connected

Allowable 
pressure

35 kPa

Vibration 
resistance

5 m/s

2

 max. (10 to 55 Hz for 2 hours each in X, Y and Z 

directions)

Mounting nut G1 (R1 and 1-11BSP are connectable)
Lead wires

AWG #18 (approx. 1.2 mm

2

) flame retardant cross-linked 

polyethylene insulated cable, approx. 1800 mm long 
(blue and white) (only AUD100)

Conduit

G1/2 (1/2-14BSPP is connectable)

Standard and 
extended dis-
tance of flame 
signal wire

Standard: 2.0 mm

2

, 600 V cable with PVC insulation (“IV 

cable”)

Max. length: approx. 200 m

 

„

China RoHS

Содержание AUD100 Series

Страница 1: ...15 AUD100 110 AUD15 AUD15 25 000 5 UV UV AUD100 110 AUD15 AUD100 AUD15 AUD100 AUD110 2 AUD100 110 AUD100C100 UV AUD15 AUD100C1000 A15 UV AUD15 AUD110C100 UV AUD15 AUD110C1000 A15 UV AUD15 0 D T AUD110...

Страница 2: ...efore using and use it correctly Please read instructions carefully 9735 001 02 25 000 5 AUD15 X X 1371 J6 AUD100 110 AUD15 AUD100 110 AUD15 AUD100 110 AUD15 1 3 2 AUD100 F G AUD110 AUD110 F F G G AUD...

Страница 3: ...M3 5 7 3 7 mm 0 98 N m F G AUD110 AUD15 100k F G DC G F F DC160 220 V G DC160 220 V DC F G AUD100 1 3 F G 1 AUD15 50 80A AUD100 110 AUD100 110 AUD100 110 AUD100 110 AUD100 110 AUD100 110 AUD100 110 F...

Страница 4: ...AUD100 110 50 80A AUD100 110 AUD100 110 120 FSP136A100 FSP136A FSP136A AUD15 AUD100 110 AUD100 110 FSP136A100 AUD100 110 2K AUD100 110 AUD15 AUD100 110 1 4 1 25 000 5 UV UV AUD15 AUD15 AUD100 110 AUD...

Страница 5: ...AUD15 AUD100 110 AUD15 AUD100 110 AUD15 J2 AUD100 110 AUD100 G1 2 AUD110 AUD100 110 20 120 40 90 RH AUD100 AUD110 120 g AUD15 140 g 120 g AUD15 140 g DC500 V 50 M AUD15 IP65 JIS C 0920 IEC 60529 35 kP...

Страница 6: ...10 10 V 2010 2020 Azbil Corporation All Rights Reserved AUD110C100 AUD15 mm 60 140 90 40 64 76 G1 2 52 G1 AUD15 F G M3 5 AUD100C100 AUD15 mm 105 55 64 41 G1 2 G1 40 24 1800 AUD15 AUD15C1000 81447479 0...

Страница 7: ...ination with Azbil Corporation s burner controllers CAUTION Installation wiring maintenance inspection adjustment and the like of the AUD15 and AUD100 110 should be car ried out only by a trained and...

Страница 8: ...r chlorine ethylene compounds acids or corrosive gases Prolonged vibration If gas cannot be allowed to leak out of the furnace through the monitoring pipe take appropriate counter measures A sealed ad...

Страница 9: ...pipe 50 to 80 A Pilot burner Main burner AUD100 110 zMounting angle Mount the AUD100 110 so that it monitors the burner at an angle from above Handling Precautions If the AUD100 110 monitors from bel...

Страница 10: ...and air pressure a pilot flame detected by the flame detector will reliably light the main burner For the procedure of the pilot turndown test follow the instructions in the burner controller manual o...

Страница 11: ...h the light receiving glass surface zHow to replace the nut packing If the nut packing is damaged replace it according to the pro cedure below 1 Remove the AUD100 110 from the monitoring pipe 2 Hold t...

Страница 12: ...ion s burner controllers REPLACEMENT OPTIONAL PARTS sold separately Model No Description AUD15C1000 Tube Unit Ultraviolet photoelectric tube 81447479 001 Nut Packing 81403159 Seal adapter FSP100R15000...

Отзывы: