vii
4-3. Pneumatic piping and electric work
CAUTION
• Pneumatic tubing should be sized so as not to cause dropping of air
pressure when control valve is in operation, Pneumatic tubing should
have an allowance in bend (use specialized tool) and bands should bind
parallel tubing.
• Only qualified persons should do electric work in accordance to electrical
facility engineering standards.
• Cable connections should be made to conform to the facility's conditions.
A suitable adaptor or packing should be selected to suit the outer
dimension of the completed installation.
• When using seal tape on pneumatic tubing, do not apply the tape on the
first two threads from the tip of connector. This may block air passage and
cause malfunction of valve.
• When using liquid packing (seize lock) on pneumatic tubing, care should
be exercised so as not to leak the liquid into tubing. It may block the air
passage, resulting in valve malfunction.
• Avoid electrical work in rainy weather or time of high humidity. Any
intrusion of water into connector or terminal will cause rusting and
electric leakage.
• Covers of accessories such as the positioner are provided with seal
packing (gasket). Exercise care so as not to misplace or lose them while
electric work is in progress.
• Exercise care so as not to lose fixing screws of accessories such as the
positioner. When tightening screws, ensure that packing is in place and
tighten screws with an even torque.
• Cable threads and conduit seal should be tightened so as to ensure that
water does not get in.
Seal
tape
Two threads
Liquid run
Positioner
Содержание ACN Series
Страница 1: ...CM2 ACP100 2001 Control Valves Model ACP_ _ _ ACN_ _ _ User s Manual ...
Страница 18: ...1 4 ...
Страница 24: ...3 2 ...
Страница 44: ...4 20 ...
Страница 58: ...7 6 ...
Страница 62: ...8 4 ...
Страница 68: ...10 4 ...
Страница 90: ...12 14 ...
Страница 94: ...14 2 ...
Страница 95: ......
Страница 98: ......
Страница 100: ......