background image

Hub is Checking In

Make sure the Hub is working

It usually takes about 1-2 minutes for the Hub to check in and show up on AyrMesh.com,
but sometimes it can take a little longer.

The signal lights (4 top lights) will start out 
"running" from bottom to top. When the
Hub has checked in to AyrMesh.com, just

the top signal light will be on.

Slip the gland onto the Ethernet cable using the
slit in the gland, then push the cable through 
the hole in the cover. Push the gland back into 
the cover, then screw the cover back onto the Hub.

To be weather-tight, the bottom gland and
cover must be installed. To do that, remove

the gland from the cover:

®

4

Finish the Installation

All Hubs should be mounted outside, up as

high as possible, with the antenna pointing
straight up.

Maximum range for the Hub depends on
having clear line-of-sight.
The Hubs can be mounted to a 

at surface

with four screws, or to a pole with the 
included zip ties or pipe clamps. 

Flat Surface

3

Pole Mount

Отзывы: