USER MANUAL
11
____________________________________________________________________________________________________________________
8.
Preparing balance to work
1.
Take the balance, the feeder and
mechanical elements of the pan out. It is
recommended to keep the original scale
package in order to transport the
balance safely in future.
2.
Place the balance on a stable
ground not affected by mechanical
vibrations and airflows.
3.
Level the balance with rotating legs
6
so that the air bubble in water level
7
at the back of the balance is in the
middle.
4.
(for AGC100-AGC600) Gently insert
the mandrel of pan support
2
into
balance mechanism socket through the
pan ring 3 and the pan
1
on (AGC600
balances have not pan ring).
5.
(for AGC1000-AGC4000, AGZ10C)
Place nuts
2
on mandrels that are visible
in balance cover holes, put the pan
1
on
nuts.
7
6
1
2
3
7
6
1
2
If the balance was taken from a lower temperature surrounding to a room with
higher temperature, e.g. in winter, moisture can liquefy on the balance casing.
Do not connect power supply to the balance, because this can cause damage
or improper work of the balance. In this case leave the balance for at least 4
hours unplugged for acclimatization.