18
INSTRUCTION MANUAL
_____________________________________________________________________________________________________________________
8.2
Preparing overrun scales
1.
Unpack balance, removing protective foils.
2.
Place balance on flat, horizontal foundation, in
place not subjected to mechanical vibrations and
strong air movements. Take care if the scale stays on
all four legs.
3.
Air bubble in level should be located in the middle
position.
Good Bad
4.
Lift scale corners up and put locks under in such
way that scale legs go into prepared holes.
5.
Mount locks permanently to the ground using
10
holes.
6.
Put balance approaches (drives) on settling them
into locks.
7.
Unscrew transport handles (mounted for
transport).
8.
In hermetic scales plug not used joints with
supplied caps. Attach meter to the wall, desktop or
tripod (option), choosing one of three methods.
9.
Connect the supply cable plug to socket with
protective contact, when balance is unloaded.