Axioma QALCOSONIC E 1 Скачать руководство пользователя страница 12

PEE1V03        

 

    20-11- 2017 

12 

The direction of the sensor installation (is indicated with the arrow on the label of flow sensor) must match with the 
flow direction in pipeline. 
Before installing the flow sensor, rinse the pipe well; mount the spacer for this purpose. 

The  flange  gaskets  must  match  with  the  pipe  diameter.  During  the  installation  gasket  must  be  exactly 

centered with the center of the pipe cross-section to avoid sticking out gaskets inside the pipe. 
 

It  is  forbidden  to  wire  flow  sensor  signal  cables  nearby  (less  than  5  cm)  with  power  cables  or  cables  of 

other devices. 

 

5.3.3. Mounting of temperature sensors

 

Temperature sensors are mounted  by head upwards, is perpendicular to the pipe axis or inclined by 45 ° 

angle on fluid flow direction so that the sensing element has been inserted in medium at least up to the pipe axis or 
beyond (as shown in Annex C). 

 

For meters with flow sensor joining G3 / 4 ', G1, and G1 ¼'  – one temperature sensor is mounted in the 

flow sensor housing. 
 

It is forbidden to wire signal cables of temperature sensors  nearby (less than 5 cm) with power cables or 

cables of other devices. 

 

         

5.4. Setting up the jumpers (J) 

 

 

The  connector  J  is  on  the  calculator  plate  between  the  temperature  sensors  and  pulse  input  /  output 

connection  terminals  (Figure  A1).  Joining  or  leaving  open  the  connector  contacts,  you  can  choose  the  normal  or 
verification (test) mode, activate the pulse inputs or outputs: 

 
 
 
 
 
 
 
 
 
 

 
 
 
 

Fig. 6.1. Definition of jumpers 

 

 

 

 

5.5. Verification of installation and set-up  

 

After  installing  the  heat  meter,  let  measured  fluid  flow  through  the  flow  sensor.  Measured  parameter  values 

should  be  indicated  on  the  display,  if  the  heat  meter  (calculating  unit,  flow  and  temperature  sensors)  is  installed 
correctly. If measured parameter values are not displayed correctly, it is necessary to verify the installation. 
 

5.6. Sealing after installation

 

The  meter  must  be  sealed  according  to  p.4.2  to  ensure  that  after  the  installation,  it  is  not  possibility  of 

dismantle, remove or altering the meter without evident damage on the meter or the seal.  
 
Mounting seal: 

Hanging seal on the junction between upper and lower part of the housing of the calculator (see Annex 
C, Fig.C1)  

Seals on the protective cover and  mounting bolt of temperature sensors (see Annex C, Fig.C3). 

 

-     Connection of flow sensor with the pipeline should be sealed in addition.  

Jumper is not set (contacts are opened) 

Jumper is set  (contacts are connected) 

NORMAL MODE 

VERIFICATION (TEST) MODE 

The first pulse output is active  
( terminals 52,53) 

The first pulse intput is active  
(terminals 52,53) 

( Jumper must be removed when operating in 
TEST mode)

 

The second pulse output is active 
(terminals 50,51) 

The second pulse intput is active   
(terminals 50,51) 

( Jumper must be removed when operating in 
TEST mode)

 

Содержание QALCOSONIC E 1

Страница 1: ...Axioma LEZ UAB ULTRASONIC THERMAL ENERGY METER QALCOSONIC E 1 TECHNICAL DESCRIPTION INSTALLATION AND USER INSTRUCTIONS PEE1V03 KAUNAS...

Страница 2: ...2014 35 EU 2014 53 EU Directive 2014 32 EU of the European Parliament and of the Council of 26 February 2014 on the harmonisation of the laws of the member states relating to the making available on t...

Страница 3: ...semblies of heat meter is permissible only after ensuring of absence of heat conveying fluid in the pipeline 1 APPLICATION FIELD The ultrasonic thermal energy meter QALCOSONIC E 1 is designed for meas...

Страница 4: ...de Type Code None 0 MODBUS RS485 5 M bus 1 LON 6 CL 2 MiniBus 7 868 MHz RF module 4 BACnet 8 Power supply Code 3 6 V Internal battery 1 24 V AC DC main power supply 2 The length of the flow sensor sig...

Страница 5: ...8 G1 2 5 5 0 025 0 005 190 9 4 G1 arba DN20 3 5 7 0 035 0 017 260 4 G1 1 4 arba DN25 6 12 0 024 0 012 260 10 G1 1 4 arba DN25 6 12 0 06 0 012 260 10 G1 1 4 arba DN25 10 20 0 04 0 02 300 18 G2 arba DN...

Страница 6: ...month values of the measured parameters are stored in memory of the meter All data from archive can be read only by means of the remote reading see p 6 5 In addition data logger records of monthly par...

Страница 7: ...t hour Pulse outputs Pulse outputs 2 OB normal mode OD test mode Type open collector permissible current up to 20mA voltage up to 50V Pulse duration 125 ms in the normal operating mode 1 2 ms in the t...

Страница 8: ...nsor in return pipe Q V1 2 hT1 hT2 There Q thermal energy V1 Water volume m 3 1 2 Water densities according to supplied and return water temperatures 1 2 hT1 hT2 The enthalpies according to water temp...

Страница 9: ...cumentation of other system components and in heat meter installation project It is forbidden to wire signal cables nearby less than 5 cm with power cables or cables of other devices It is forbidden t...

Страница 10: ...d in several different ways Wall mounting without possibility sealing of mounting Wall mounting with possibility sealing of mounting Mounting on standard DIN rail Panel mounting Direct mounting on ult...

Страница 11: ...th nominal diameter DN65 to DN100 necessary straight pipeline length in upstream direction are 5 x DN and in downstream direction 3 x DN For flow sensors of other sizes the straight pipelines installa...

Страница 12: ...ng or leaving open the connector contacts you can choose the normal or verification test mode activate the pulse inputs or outputs Fig 6 1 Definition of jumpers 5 5 Verification of installation and se...

Страница 13: ...ent units and operation modes Destination of the special symbols the flow is flowing forward right direction the flow is flowing backwards arrow is not displayed the flow does not flow Destination of...

Страница 14: ...ing the readings in normal mode Integral parameters values 1 2 or if at least one error has been detected error code 1 1 are displayed if the button has not been pressed for more than 60 seconds INT i...

Страница 15: ...tariff 1 INT INF BIL Snowflake indicates that the tariff is linked to the meter of cooling energy 1 5 Integrated energy of tariff 2 INT INF BIL Snowflake indicates that the tariff is linked to the met...

Страница 16: ...p INT INF BIL INT INF BIL Changing with date stamp every 1 second 2 6 1 st pulse input pulse value on set day with date stamp INT INF BIL INT INF BIL Changing with date stamp every 1 second 2 7 2 nd p...

Страница 17: ...INF BIL INT INF BIL Changing with date stamp every 1 second 2 14 2 nd pulse input pulse value on set day of previous month with date stamp INT INF BIL INT INF BIL Changing with date stamp every 1 sec...

Страница 18: ...INT INF BIL INT INF BIL Changing with date stamp every 1 second 2 23 Minimum temperature difference of previous month with date stamp INT INF BIL INT INF BIL Changing with date stamp every 1 second 2...

Страница 19: ...IL It is possible to choose One of the measured parameters 1 st or 2 nd pulse input if it is configured as an input one of the temperature or the temperature difference 3 12 Tariff 2 Similarly ID 3 11...

Страница 20: ...on number 3 19 Serial number 3 20 MBus adress INT INF BIL 3 21 Working hours without a power calculation error INT INF BIL 3 22 Battery operation time INT INF BIL Remark Values of the parameters marke...

Страница 21: ...d if the test mode is made active 4 3 Number of pulses of 1st pulse input INT INF BIL 4 4 Number of pulses of 2nd pulse input INT INF BIL 4 5 Temperature of heat conveying liquid in flow pipe INT INF...

Страница 22: ...er than 1 2 qs are displayed q 1 2qs 8 electronics failure Active error codes are added and simultaneously displayed if it is detected more than one error 3 corresponds errors 2 1 5 corresponds errors...

Страница 23: ...easurement units kWh MWh GJ Gcal Display resolution of energy 000000 01 Wh 0000000 1 kJ 0000000 1 kcal Display resolution of volume 00 000001 m 3 Energy and volume pulse values in verification mode TE...

Страница 24: ...another type without removing of verification seal Data collection from meters can be realized via PC via telephone modem via GSM modem via Internet and so on 7 VERIFICATION Metrological control of h...

Страница 25: ...PEE1V03 20 11 2017 25 Annex A Fig A1 Electrical wiring diagrams T1 flow temperature sensor T2 return temperature sensor V1 additional pulse input output 1 V2 additional pulse input output 2...

Страница 26: ...t additionl pulse input output In Out1 Energy output for TEST mode Additional plug in modules Numbering of communication module terminals Terminal Nr Destination 20 CL CL module 21 CL CL module 24 25...

Страница 27: ...of heat meter QALCOSONIC E 1 Fig B2 Sizes and dimensions of heat meter QALCOSONIC E 1 Fig B2 1 Flow sensor qp 0 6 1 0 1 5m 3 h Fig B2 2 Flow sensor qp 2 5 1 5 m 3 h Threaded end connections G3 4 Threa...

Страница 28: ...3 20 11 2017 28 Annex B a Threaded end connection b Flanged end connection Fig B2 3 Flow sensor qp 0 6 1 0 1 5 2 5 m 3 h Threaded end connection G1 a flanged end connection DN20 b Mounting length L 19...

Страница 29: ...PEE1V03 20 11 2017 29 Annex B b B2 4 pav Flow sensor qp 3 5 6 0 m 3 h Threaded end connections G1 1 4 a b flanged end connection DN25 b Mounting length L 260 mm a b...

Страница 30: ...c Fig B2 5 Flow sensor qp 10 0 m 3 h Threaded end connections G2 a flanged end connection DN40 b c two design options Mounting length L 260 mm Fig B2 6 Flow sensor qp 15 0 m 3 h flanged end connection...

Страница 31: ...qp 25 0 m 3 h flanged end connection DN65 Mounting length L 300 mm Fig B2 8 Flow sensor qp 40 0 m 3 h flanged end connection DN80 Mounting length L 300 mm Fig B2 9 Flow sensor qp 60 0 m 3 h flanged en...

Страница 32: ...ng electronic module manufacturer security seal 3 mounting seal after installation a Flow sensor qp 0 6 1 0 1 5 2 5 m 3 h b Flow sensor qp 3 5 6 0 m 3 h threaded or flanged end connection threaded or...

Страница 33: ...n and sealing WARRANTY Manufacturer gives the warranty that equipment parameters will meet the technical requirements listed in the paragraph 2 of this document if transportation storage and operation...

Отзывы: