![Awite AwiECO Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/awite/awieco/awieco_original-instruction-manual_3035491020.webp)
Preparing the Gas Analysis System for Use
5
Preparing the Gas Analysis System for Use
WARNING
This is a complex measuring and control system. Incorrectly performed installation, electrical
installation, initial operation, or maintenance can lead to hazards and possibly even to death due to
electric shock or risk of explosion. The respective work on the gas analysis system may therefore
only be performed by trained professional personnel. The specialist personnel must have read and
understood the Instruction Manual and follow its instructions.
5.1
Transport and Storage
This gas analysis system must be protected against impermissible loads or damages by, for example,
humidity, vibration or shock. In the event of mechanical defects with electrical or electronic components,
the gas analysis system must not be put into operation. The same environmental conditions as those for
the operation apply to a possible storage of the gas analysis system before installation and commissioning.
5.2
Installation
The installation must be performed only by qualified personnel. They must be well familiar with the
contents of this manual and any other provided manuals and repair instructions as well as with the
safety instructions and specifications on the devices. In addition, the applicable national, local and
system-specific regulations and provisions must be considered. An over-voltage protector must also
be provided for by the operator.
The dimensioning of the gas analysis system can be found
device casing have to be leak-proofed and closing elements have to be screwed in tightly. The device must
not be installed in unvented shafts or poorly ventilated rooms. There must be enough space around the
device so that the door of the casing can be opened and the device can be operated and controlled easily.
For devices with a cooler, there has to be enough space for the circulation of air around the heat sink (at
least 30cm).
CAUTION
In the event of a malfunction, the device can be brought into a safe state by de-energizing it. The device
therefore has to be installed in such a way that the main switch operation is not impeded.
20