
11/13
Dirt Trap - Type: DN25 - DN100 / PN10
Operating Instructions
20
Welding
- Connect forming gas before welding.
- Affix 3 to 4 tack welds before welding.
Weld after-treatment
- No treatment is necessary on the interior after welding.
Accessible areas can be ground.
- The exterior can be treated afterwards by staining, brushing, grinding and polishing.
Cleaning
- Clean all welded parts before assembly.