AV-09-4WL Solar Windsock Light Kit
Regulator Connection & Operation
Regulator Connection Order
The label on the Regulator has each system connection labelled from 1 to 6. This is the recommended
order of system connections.
IMPORTANT: The BATTERY must be connected before the SOLAR to properly start the
microcontroller.
1. BATTERY: Connect the battery (+) and battery (-) to the Regulator
2. SOLAR: First, be certain the battery (+) and battery (-) is connected correctly. Then connect the
solar array to the SOLAR terminals.
Selecting Lighting Control Option
After completing the system connections, select the desired LIGHTING CONTROL option.
A brief description is as follows:
OFF
Lights remain turned off
2, 4, 6, 8, 10
Hours light is turned off after sundown
3/1, 4/2, 6/2
Light is turned on after sundown, turned off during the night, and turned on again
one hour (3/1) or two hours (4/2, 6/2) before sunrise
D/D
Dusk-to-Dawn, light is on all night
The factory setting of the light is D/D (Dusk-to-Dawn).
To select a lighting option, turn the rotary digital switch to the desired position. An arrow in the rotary
switch will point to the selected position. This is a digital switch, so it will click into each of the ten
positions.
To confirm correct selection of the desired control option, press the TEST button located below the
rotary switches.
+
+
+
4
3 2
1 6
5
OFF
2
4
6
8
10
3/1
4/2
6/2
D/D
TEST
SOLAR
BATTERY
LIGHT
SEALED
OR
FLOODED
SELECT
CHARGING
LOW VOLTAGE
DISCONNECT
LIGHTING CONTROL
TEMP SENSE
Regulator Diagram