background image

A V L   L O O M S 

AVL Looms, Incorporated 
 
2360 Park Avenue, Chico, California 95928-8305 
Phone:  530-893-4915    Fax:  530-893-1372    www.avlusa.com

 

 

Revision 4/9/14 

6.  When the Spring Lever Return Cable is in place, refer to Pages 5 and 10 of your 
Compu-Dobby Manual for re-installation, and Page 21 for Adjustment procedure.

 

 
Installation of the Spring Lever Return Cable (continued) - Note the opening in the 
Dobby Arm through which the Left Treadle Cable is attached.  Remove the old cable by 
pushing down on the cable until the plastic cable retainer button falls from the bottom of 
dobby arm.  Save the plastic cable retainer button for later. Remove the old Cable from 
the Dobby Arm by pulling it up through the dobby arm. 

From the top side of the Dobby Arm, insert the new cable through the hole in the 

Dobby Arm, previously used by the Left Treadle Cable and secure it with the plastic 
cable retainer button saved from the old cable removal.  Route the cable over the top of 
the Dobby Box Pulley, from left to right, and under the cable retainer.  Guide the cable 
behind the Dobby Bar, down the outside of the loom, and around the bottom of the Lever 
Pulley (formerly the Left Treadle Pulley).  Connect the looped end of the cable to the 
Spring Lever, using the Eyehook located at the tip of the Lever. 

Check to see that the cable is running in a direct line from the right side of the 

Dobby Box pulley straight down to the Lever Pulley and on over to the Lever.  Loosen 
the stop collars to either side of the Pulley and adjust the position as needed. 
 
5b) The Cam-Motor Pulley Cable – Check to be sure the Dobby Arm is in the Up 
Position before proceeding.  Unwrap the cable from the 6 inch diameter wooden Cam.  
Guide the cable down and around the bottom of the Cam, over to the Pulley located on 
top of the Motor Box.  Bring the cord around the left, front side of the Motor Pulley.  
Insert its end into the hole you see at the base of the Pulley and lock the crimp in the hole 
with the hitch pin.

  

(Note: do not use the hole located at the top of the Pulley).

  

Turn the 

Pulley clockwise, while starting at the bottom, winding on and taking up all of the slack.  
Do not allow the winding to overlap. 
 

The two cables on the Cam/Cylinder Assembly need to align directly with their 

respective anchor points.  The Dobby Arm Cable must run vertically from the Dobby 
Arm to the Cylinder and the Cam/Motor Pulley cable needs to run in a direct line from 
the Cam to the Motor Pulley on the top of the E-Lift II+ Motor Box.  In order to 
accomplish this, with the respective stop collars loosened, slide the Cam and Pulley into 
place along the Axle and tighten the Stop Collars. 
 
6) 

Connect the Foot Switch Cord and the Power Cord

 – (See Figure #1a, 1b) Connect 

the Foot Switch Cord to the front of the E-Lift II+.  Connect the female end of the Power 
Cord at the back of the housing (be sure it is completely, firmly inserted).  Turn off the E-
Lift Power Switch.  Plug the male end of the Power Cord into a surge-protected power 
strip or directly into a wall plug. 
 
 

Содержание E-Lift II+

Страница 1: ...y e mail to info avlusa com INSTALLATION Package Contents Note If upon your inspection of the contents of your package all pieces listed here are not represented please contact AVL Looms immediately prior to installation See Figure 2 for help with identification of these components and hardware Quantity Description 1 E Lift II Motor Pulley Box Fig 1a 1b 1 Spring Lever Assembly 1 Spring Lever Stand...

Страница 2: ... and 1 2 Sockets 5 32 Allen Wrench Pliers Drill with 21 64 Bit Tape Measure Masking or other type of Tape Pencil SDL IMAGES The vast majority of SDLs made by AVL were configured with a 20 weaving width with a few produced with 30 weaving width The images in this manual reflect the 20 loom For the 30 loom the spring lever return and E Lift position appear closer to the center since the mounting of ...

Страница 3: ...ove it from the Dobby Arm Keep the black retainer collar for this installation Disconnect the Figure 2 Assembly Components and Hardware Identification Right Treadle Cam Cable from the Treadle but do not disconnect the Cylinder Cable from the Dobby Arm Remove your Left and Right Treadle Assembly 2 Remove the Treadle Cable Axle from the Treadle Pulley Support Crossmembers If your axles are fitted wi...

Страница 4: ...f Drilled Holes If the three 3 holes are not already present they will need to be drilled at this time You may wish to remove the Crossmembers in order to complete this task If so you can remove the two 2 hex bolts holding each of the Treadle Pulley Support Crossmembers to your loom Be sure to mark the left and right sides and the inside and outside face of both Crossmembers with tape and pencil p...

Страница 5: ...o Spring Lever install with eyehook at the tip facing to the right side of the loom 1 5 16 Washer 1 5 16 18 Nylock 5 Re install the Treadle Pulley Support Crossmembers to the loom Take care to place them in the same positions as they were previously installed 6 Install Mounting Blocks see Figure 5 Mount the two Blocks onto the top of the E Lift Motor Box Run one 1 5 16 18 x 2 Hex Bolt with one 1 5...

Страница 6: ...ep them from falling out while not protruding into the central area Position the Box in the space between the Crossmembers so that the Plug Connection for the Pedal faces to the Front and the Motor Box Pulley is closest to the Left Side of the loom Lift the Box into place and push the Mounting Block Bolts all the way through the Blocks and tighten in place with one 1 5 16 Washer and one 1 5 16 Nyl...

Страница 7: ...t Treadle Pulley Disconnect the Dobby Arm Cylinder Cable from the Cylinder leaving it attached to the Dobby Arm Use a sley hook to reach into the side hole and pull out the retainer allowing the Cable to slip free of the Cylinder 4 Replace Cam Pulley Axle see Figure 6 Attach the Dobby Arm Cable to the new Cylinder using the retainer to hold the Nico tip in place on the new Cylinder Starting from y...

Страница 8: ...om the Compu Dobby or detach it from the Mount Box in order to be able to extract the Compu Dobby completely from the Mount Box 3 Using a Phillips screwdriver remove the two 2 screws that hold each Plate in place Be aware that there is a small spring behind each Set Screw which will gently push the box out as the Retainer Plates are removed 4 Lift the Box free of the Mount and set it aside Be sure...

Страница 9: ...to the Lever Pulley and on over to the Lever Loosen the stop collars to either side of the Pulley and adjust the position as needed 5b The Cam Motor Pulley Cable Check to be sure the Dobby Arm is in the Up Position before proceeding Unwrap the cable from the 6 inch diameter wooden Cam Guide the cable down and around the bottom of the Cam over to the Pulley located on top of the Motor Box Bring the...

Страница 10: ...een the two modes is accomplished by pressing and holding the foot pedal for a slow count of ten The Double Shed Mode with one pedal action on your part will complete every lifting cycle beginning and ending with the open shed For example assume you have just completed a shot and the shed is still open You depress the foot switch and the shed closes the dobby advances to the next pick and the shed...

Страница 11: ...wear especially where they move over a pulley Do this on a monthly basis if you weave regularly b Check the supporting hardware and re tighten if loose Your E Lift II is designed to provide years of dependable service When replacement parts such as the air filter or cables are needed AVL is your source AVL can also rebuild your E Lift II when it reaches the end of its wear cycle Please contact us ...

Отзывы: