Assembly and Installation
Cable Installation
1.
Starting from the back of the column, the display power
cord and network cable can be run through the cutout
towards the top of the post and down through the front
of the post.
WARNING:
Ensure that the cables are running down
the front side of the post covered by the rubber cable
sleeves as opposed to the back of the post that houses
the gas cylinder locking pin.
2.
Once the display power cord and network cable are at
the bottom of the post, pull the cords out through the
back egress towards the base of the post. Pulling the
cords out from the right side of the gas cylinder is easiest.
3.
Run the content sharing (DVI to VGA) cable through the
cutout towards the top of the post starting with the VGA
end of the cable. Then run the cable down the front
of the post covered by the rubber cable sleeves,out
through the egress in the front middle of the post, and
through the back cutout of the storage shelf which will
be installed in a later step.
4.
Route cables from the touchpanel and microphones
through the storage shelf, out the back cutout of the
storage shelf, through the cutout on the front middle of
the post, up the post (staying behind the rubber cable
sleeves), and out through the cutout towards the top of
the post.
1
2
3
4
Touchpanel
and micro-
phone cables
Power and
Ethernet
cables
Extended Height Cart | User & Installation Guide
© 2013 Avizia Inc. All rights reserved. | aviziatech.com | AVZ-MXC-DOC-UIG-04
7