
15
5. Install the ball link socket to the ball head fitting on the stabilizer control horn as shown. Repeat
this step on the other side.
Check
from the rear
to
ensure both elevator halves are level on each
side.
If necessary, adjust the clevis by turning half a turn either clockwise or anti-clockwise to
achieve a neutral elevator.
6. Connect the flap control linkages as shown. The length of the flap control linkages are factory
set. Ensure the outer and inner flaps are
set
perfectly level
with each other
. If necessary, adjust
the
clevis
by turning half a turn either clockwise or anti-clockwise to
achieve this
.
Note:
Check Left and Right flap control surfaces after the setup. Both inner and outer flaps
have to be level when in operation. i.e., From retract position to fully deployed position.