manualshive.com logo in svg
background image

 MLN-192 Option Card Installation

4

Install the MLN-192 Card

MLN-192 Card installation differs depending on the type of E6L 
engine. Follow the instructions in the section appropriate for your 
E6L engine: 

• “E6L-192 and E6L-144” on page 4
• “E6L-112” on page 5

E6L-192 and E6L-144

With E6L-192 and E6L-144 engines the MLN-192 Card 

must

 be 

installed in slot 7. (Slot 6 is reserved for WSG-HD Waves Sound-
Grid cards only.)

The E6L-192 and E6L-144 engine core has eight half-length 
PCIe slots for Option cards. When standing at the back of the E6L 
engine, slots 1–5 are at the lower right and slots 6–8 are in the 
middle (below the AVB slots) as shown in Figure 11. 

To install an MLN-192 Card: 

1

Remove the faceplate from slot 6 by loosening its captive 
thumbscrew and then pulling it out of the slot. 

2

Remove the MLN-192 Card from its packaging and hold it by 
its edges.

1

Using a #2 Phillips screwdriver, loosen the two captive thumb-
screws that secure the Option Card bracket to the chassis and 
set the bracket aside. 

2

Inside the unit, place the face of the card into position in slot 7, 
with the back of the card tilting upwards.

Using two hands, hold the front of the card in place in the slot 
with one hand, and slowly move the back of the card down-
wards along the back bracket until the card is horizontal.

3

From the back of the core, make sure the faceplate of the Op-
tion card is correctly aligned with the open slot cover.

Figure 11. E6L Expansion slots 1–5 (lower right) and 6–8 (upper left)

Figure 12. Slot 7 for MLN-192 Card

IN

OUT

ASTER 1

WORD CLOCK

UTIL

EXPANSION

6

7

8

1

2

3

4

5

AVB-192

ACT

SIG

ACT

SIG

ACT SIG

ACT SIG

A

B

1-5

6-8

IN

OUT

MASTER 1

WORD CLOCK

UTIL

EXPANSION

6

7

8

AVB-192

ACT

SIG

ACT

SIG

ACT SIG

ACT SIG

A

B

Slot 7

Figure 13. MLN-192 Card

Figure 14. Removing the Option Card bracket

Before inserting the card, make sure the red and black 
AVB-192 power cable is above the card and out of the way. 

Figure 15. Guiding the card into position

Ethernet ports

Rear bracket

Flange

PCIe connector

Faceplate tab

Содержание Milan MLN-192

Страница 1: ...of Avnu Alli ance Inc in the United States and other countries Unauthorized use strictly prohibited Removing the E6L Engine Core MLN 192 cards are installed in the E6L engine core which slides out of...

Страница 2: ...le that connects the upper AVB 192 Network Card slot 2 middle to the lowerAVB 192 Network Card slot 1 lower Set the cable aside you will re install it later 2 Disconnect all cables connected to theAVB...

Страница 3: ...6L Engines will already have these brackets pre installed Back Bracket If your E6L 192 or E6L 144 Engine Core has the original Back Bracket shown below you must replace the old bracket with the includ...

Страница 4: ...captive thumb screws that secure the Option Card bracket to the chassis and set the bracket aside 2 Inside the unit place the face of the card into position in slot 7 with the back of the card tilting...

Страница 5: ...plate on the MLN 192 card and install it in Network slot 3 E6L 112 engines support a maximum of two Option cards in stalled into Expansion slot 1 and or Network slot 3 as explained in Appendix B E6L...

Страница 6: ...all cards into Expansion slots without disconnecting these cables as long as you are careful to not stretch the cables or damage their connectors while installing the cards 6 Remove the Option card gu...

Страница 7: ...the faceplate of the MLN 192 card is correctly aligned with the open slot and then secure the card to the core by tightening the captive thumb screw 11 If you disconnected any power cables to DSP car...

Страница 8: ...crews that secure the faceplate to the card Keep the screws nearby to use to secure the new faceplate 3 Remove the faceplate and set it aside 4 Turn the MLN 192 card over so it is face up 5 Take the n...

Страница 9: ...racket captive thumbscrew to secure the back of the MLN 192 card to the back bracket 9 Proceed to Re install the E6L Engine Core on page 12 Re Install the AVB 192 Cards E6L 192 and E6L 144 Only After...

Страница 10: ...rd is horizontal make sure the tab on the faceplate of the Network card is positioned on the outside of the slot 4 Align the PCIe connector on the card with the corresponding PCIe port and align the f...

Страница 11: ...le port on the upper AVB 192 card 9 If you reinstalled a WSG HD card in slot 6 make sure to re connect the Ethernet jumper cable from the left most Ethernet port on the Master AVB card to the left mos...

Страница 12: ...firming Installation Confirming Installation After installing the MLN 192 card and updating firmware if nec essary confirm that the installation was successful To confirm installation 1 Power on your...

Страница 13: ...om the top of the back bracket Set the fasteners aside you will use them to secure the new bracket 3 Using a 2 Phillips screwdriver loosen the two captive thumb screws that secure the back bracket to...

Страница 14: ...talling the new Option Card bracket instructions also pro vided below To install the new Option Card bracket 1 After the card has been installed position the new bracket as shown with its two slots fa...

Страница 15: ...T T SIG S SIG IG A A WSG HD OUT W EXPANSION ACT A AVB 192 AVB 192 ACT AC ACT A T SIG SIG SIG ACT AC ACT T SIG S SIG IG A A MADI 192 Configurations 1 MLN 192 in Expansion Slot 1 2 MLN 192 in Network Sl...

Страница 16: ...MLN 192 Option Card Installation 16...

Отзывы: