6 12.21
Remove 4x L
profiles
DRAWN
CHECKED
ENG APPR
MGR APPR
Classe di tolleranza*:
ISO 2768-M
*Ove non diversamente specificato
NAME
Tech. Dept.
DATE
11/15/20
NAME:
SIZE
A2
FILE NAME: forkshook.dft
SHEET 1 OF 1
Material:
Error: No refere
Spessore:
forkshook
PROJECT:
Raggio di piega
R=1.3
Cava V10
Tutte le pieghe si
intendono a 90°
dove non
diversamente
specificato
DRAWN
CHECKED
ENG APPR
MGR APPR
Classe di tolleranza*:
ISO 2768-M
*Ove non diversamente specificato
NAME
Tech. Dept.
DATE
11/15/20
NAME:
SIZE
A2
FILE NAME: forkshook.dft
SHEET 1 OF 1
Material:
Error: No refere
Spessore:
forkshook
PROJECT:
Raggio di piega
R=1.3
Cava V10
Tutte le pieghe si
intendono a 90°
dove non
diversamente
specificato
Minimum 3 hanging
points to fork lift, to
avoid shifting of the
lifting bands
Lifting bands
L
a
y
do
w
n
Lay a spacer on the
floor with the same
height of the pallet
Step 1
Step 2
Step 3
Remove the screws from the feet to remove
the feet
Lifting bands
can damage
components
6.1 UNIT HANDLING AND
INSTALLATION
The unit is factory delivered on a pallet to ensure an easy
and safe transport. We reccomend to follow the instruction
step by step. For crane handling all applicable crane safety
regulations must be respected.
• The delivered pallet is not suitable for crane handling.
• The pallet and the unit must be placed on a specific crane
platform duly designed and sized.
• Access panels and electronics controls must always be
closed and protected during handling.
6.2 HANDLING PROCEDURE
The unit and the pallet has been sized to pass through
most of the standard doors. In order to avoid damage we
suggest to bring it as close as possible to the installation
place.
Avensys srl reserves the right to make changes without prior notice
SG MANUAL - Heat Recovery unit
Installation - Operation - Maintenance