INSTALLATION PROCEDURE – HYBRID HEATED TOWEL LADDERS
1. Using the supplied MDF template
•
Apply the supplied double-sided tape to the MDF template and
remove the backing.
•
Feed the wire protruding from the wall (as described above) through
the larger (10mm) hole in the MDF template.
•
Using a spirit level stick the MDF template squarely to the wall.
•
Using an 8mm bit and the MDF template as a guide, drill four holes
in the wall surface to a depth of 40mm.
2. Fix the mounting legs to the wall
•
Remove the MDF template and double sided tape.
•
Insert the 4 supplied wall plugs into the holes in the wall.
•
If necessary use a sharp blade to trim the wall plug so that they are
flush with the wall surface.
•
Fasten the four mounting legs to the wall using the large stainless
steel screws (4 supplied). Note the orientation of the mounting legs
and the position of the screws in the diagram.
3. Install the ladder on the mounting legs – Top
•
Loosen the four grub screws on the reverse side of the ladder.
•
Slide the left and right aluminium covers towards the top of the
ladder so that the top fixing holes are exposed.
•
If the electrical connection is though one of the top mounting legs
then feed the wire protruding from the wall through the larger hole in
the aluminium cover.
•
Using 4 supplied small stainless steel screws; attach the aluminium
covers to the top mounting legs (top left shown above).
4. Install the ladder on the mounting legs – Bottom
wwwww
•
Slide the heated towel ladder upwards until the bottom fixing holes
on the aluminium covers are exposed.
•
If the electrical connection is though one of the bottom mounting
legs then feed the wire protruding from the wall through the larger
hole in the aluminium cover.
•
Using 4 supplied small stainless steel screws; attach the aluminium
cover strips to the bottom mounting legs (bottom left shown above).
•
Slide the heated towel ladder downwards until the left and right side
channels are flush with the aluminium covers (top and the bottom).
•
Lightly tighten the 4 screws at the rear of the ladder using the
supplied 3mm allan key.
5. Electrical connection
•
Trim the wires to length and making sure to keep them as short as
possible as there is limited space available for the connection joint.
•
Connect the 12-volt supply using the supplied crimp terminals.
•
Switch on the mains supply to the safety-isolating transformer and
allow 30 to 60 minutes to allow rail to reach maximum temperature.
•
Once tested, fit the supplied chrome caps to the ends of the side
channels and remove the green protective green film.
Models > 120W will
have 2 pairs of wires
connected in parallel