12
M a i n t e n a n c e
Every 500,000 cycles the tool should be completely dismantled and components replaced where worn, damaged or when
recommended. All ‘O’ rings and seals should be replaced with new ones and lubricated with Molykote 55M grease before assembling.
I M P O R T A N T
Safety Instructions appear on page 4.
The employer is responsible for ensuring that tool maintenance instructions are given to the appropriate personnel.
The operator should not be involved in maintenance or repair of the tool unless properly trained.
•
Remove rubber base
2
.
•
Place tool, base uppermost in vice fitted with soft jaws.
•
Using a spanner*, unscrew end plug
3
. Pneumatic piston
9
should move upward under spring
11
pressure (it may be necessary
to exert hand pressure to pneumatic piston
9
).
•
Remove ‘O’ ring
4
.
•
Withdraw pneumatic piston
9
.
•
Remove lip seal
8
and ‘O’ ring
36
.
•
Hold piston rod
10
in soft vice jaws to avoid scratching rod diameter.
•
Separate piston rod
10
from pneumatic piston
9
by unscrewing piston rod fastening bolt
5
using a spanner*.
•
Inspect air tube
12
for damage or distortion. (Air tube is screwed internally into handle and set in position with Loctite
®
222) If it
is necessary to remove air tube, the base of the air tube will require warming to a temperature of 100o C to soften the Loctite
adhesive. The air tube
12
can then be unscrewed from the handle using an Allen key*.
•
Check spring
11
is not distorted or damaged.
•
Assembly is in reverse order to dismantling.
The airline must be disconnected before any servicing or dismantling is attempted unless specifically instructed otherwise.
It is recommended that any dismantling operation be carried out in clean conditions.
Before proceeding with dismantling, empty the oil from the tool. Remove oil plug
42
, oil seal washer
43
, bleed screw
48
and bleed screw
washer
49
from the handle assembly and drain the oil into a suitable container.
Prior to dismantling the tool it is necessary to remove the nose assembly. For simple removal instructions see the nose assemblies
section, pages 8-9.
For total tool servicing we advise that you proceed with dismantling of sub-assemblies in the order shown below.
* Refers to items included in the 74200 service kit. For complete list see page 11.
Item numbers in
bold
refer to the General Assembly drawing and parts list (pages 14-15).
•
With tool in upside down position in vice, unscrew rod guide
15
using a spanner* and T-bar*.
•
Withdraw rod guide
15
.
•
Unscrew locknut
13
using an Allen key*, remove seal
14
and ‘O’ ring
98
.
•
Remove ‘O’ ring
16
.
•
Assembly is in reverse order to dismantling.
•
With tool held in vice, remove pin
26
using a pin punch*.
•
Remove trigger
25
, pin
22
, roller
23
and push wedge
24
.
•
Gently push on the head of trigger rod
20
and, remove together with ‘O’ rings
7
and
21
, guide
19
, lip seal
18
and plug
17
.
•
Assembly is in reverse order to dismantling. Ensure lip of lip seal
18
is towards head of tool.
•
Using an Allen key* remove screw
40
and washer
39
.
•
Remove swivelling inlet
38
.
•
Unscrew double male connector
41
from swivelling inlet
38
and remove nylon washer
33
.
•
Using a spanner*, remove drilled bolt
37
.
•
Remove two nylon washers
33
and air inlet block
35
.
•
Remove circlip
97
from double male connector
41
using circlip pliers and withdraw sintered filter
96
.
•
Assemble in reverse order of dismantling.
P n e u m a t i c C y l i n d e r
R o d G u i d e
Tr i g g e r
S w i v e l A i r I n l e t ( 7 4 2 0 0 - 1 2 7 0 0 )
Содержание 74200
Страница 18: ......
Страница 21: ...Instruction Manual Original Instruction Threaded Insert Power Tool 74200...
Страница 22: ......