INSTALLATION
Avaya
t
Line Interactive RM UPS Site Preparation, Installation and Operator’s Manual
S
164201663 Rev 1
26
3.
Loosen the assembly wing nuts on both rail assemblies and adjust
the rail size for the depth of your rack (see Figure 7).
4.
Position the rear hold-down bracket toward the end of the rail
assemblies where the end of the UPS will be located and tighten
the wing nut.
Front
Rear
Assembly
Wing Nuts
Rail Assembly
Wing Nut for Rear
Hold-Down Bracket
Rear Hold-Down Bracket
Figure 7. Adjusting the Rail Depth
5.
Select the proper holes in the rail for positioning the UPS in the
desired location in the rack.
6.
Using two M6
×
10 screws and two clip nuts, attach the rail to the
rear of the rack (see Figure 8).
Clip Nuts
M6
×
10
Rear Rail Screws
Figure 8. Securing the Rear Rail