After installation
Step 2: Remove the installation equipment
54
Installation of the G350 Media Gateway
December 2003
LSP failover testing
If you have an S8300 media server module installed in the G350 and configured as an LSP, you need to
perform a test to make sure that the LSP takes over control of the G350 if the G350 becomes
disconnected from the remote media server. Work with the supporting technician to perform this test. The
test involves disconnecting from the remote media server and testing the telephones connected to the
G350.
Step 2: Remove the installation equipment
Remove all equipment that you used to assist you in the installation process. This may include:
•
The CD-ROM drive.
•
The software upgrade CDs.
•
The laptop computer.
•
The modem (for installations without an S8300 module only).
NOTE:
If you have an S8300 media server module installed in the G350, leave the modem
connected to enable reporting of alarms to remote locations.
The installation is now complete.
Содержание Media Gateway G350
Страница 1: ...Installation of the Avaya G350 Media Gateway 555 245 104 Issue 1 1 December 2003 ...
Страница 8: ...Contents 8 Installation of the G350 Media Gateway December 2003 ...
Страница 18: ...Before you start Required equipment 18 Installation of the G350 Media Gateway December 2003 ...
Страница 56: ...Technical specifications Power Cord Specifications 56 Installation of the G350 Media Gateway December 2003 ...
Страница 60: ...Index W 60 Installation of the G350 Media Gateway December 2003 ...