Task
Estimated Time
Cabling the DC power supply using washers
and lugs
5 minutes for each power supply
Replacing the DC power supply cover
1 minute for each power supply
Navigation
•
•
on page 25
•
Introduction
20 Installation — DC Power Supply
May 2011
Содержание Ethernet Routing Switch 8300 Series
Страница 1: ...Installation DC Power Supply Avaya Ethernet Routing Switch 8300 4 2 NN46200 310 02 03 May 2011...
Страница 16: ...Regulatory Information and Safety Precautions 16 Installation DC Power Supply May 2011...
Страница 36: ...DC power supply installation 36 Installation DC Power Supply May 2011...
Страница 48: ...Technical specifications 48 Installation DC Power Supply May 2011...
Страница 50: ......