19
Finishing the Water Cooler Installation
Be sure to dispense a little water from both the hot and cold buttons prior to
flipping on the heating (#9) and cooling (#8) switches located on the back of the machine.
8. Once the heating switch (#9) is turned on (I),
it will take 15-20 minutes for the water to
reach it's desired hot temperature.
15-20
min
Hot
1 hr
Cold
9. Once the cooling switch (#8) is turned
on (I), it will take up to 1 hour to reach the
desired cold temperature.
Getting Started
Содержание A9
Страница 1: ...A few simple steps to ensure perfect water every time ...
Страница 2: ......
Страница 6: ......
Страница 10: ...4 14 Carbon Block Filter 14 Filter Reset Button 13 Sediment Filter Right Part Names About Your Water Cooler ...
Страница 15: ...Getting Started ...
Страница 27: ...User Guide and Maintenance ...
Страница 32: ...Cleaning ...
Страница 39: ...Troubleshooting ...
Страница 42: ...Safety ...
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......