5 Start up GP
© Copyright Reserved Autonics Co., Ltd.
39
5
Start up GP
This chapter describes start up procedure from supplying power to GP to switching user screen.
5.1
Checking list before supplying power
Before supplying power to GP, please check the following list.
No Check
Description
1
Install
status
Check waterproof rubber ring is installed.
Check all 4 fixing brackets are installed.
Check fixing brackets are fixed with approved tightening torque.
2
Ground
Check ground cable is installed with separated other device ground cable.
Check there is 3rd grounding.
3
Power
cable
Check cable connection by polarity.
Check the tightening status of screws on terminal.
4
Power
Check power voltage.
Check this is installed as separated other device power.
Содержание GP-S057
Страница 1: ... Copyright Reserved Autonics Co Ltd iii USER MANUAL ...
Страница 2: ...ii Copyright Reserved Autonics Co Ltd ...
Страница 12: ...Table of Contents xii Copyright Reserved Autonics Co Ltd ...
Страница 21: ...1 Overview Copyright Reserved Autonics Co Ltd 21 1 6 Unit description 1 6 1 GP S044 1 6 2 GP S057 ...
Страница 23: ...1 Overview Copyright Reserved Autonics Co Ltd 23 1 7 2 GP S057 Fixing bracket Panel cut out ...
Страница 24: ...1 Overview 24 Copyright Reserved Autonics Co Ltd ...
Страница 28: ...2 Installation 28 Copyright Reserved Autonics Co Ltd ...
Страница 30: ...3 Device Construction 30 Copyright Reserved Autonics Co Ltd ...
Страница 61: ...6 System Screen Copyright Reserved Autonics Co Ltd 61 Upload ...
Страница 74: ...9 Troubleshooting 74 Copyright Reserved Autonics Co Ltd ...
Страница 79: ...11 Repair and Check Copyright Reserved Autonics Co Ltd 79 ...
Страница 80: ...11 Repair and Check 80 Copyright Reserved Autonics Co Ltd MTG GPMONOU1 V1 3 1801US ...