
aurora
suspended
fires
25
ENGAGING THE FIREBOX
FOR UNLOCKED FIRES WITH 360 DEGREE ROTATION
Assemble the shaft & bearing system in the following order:
1. Push thrust bearing over shaft.
2. Engage the firebox.
3. Push 2nd thrust bearing over shaft.
4. Fit bearing cap.
5. Fit washer.
6. Fit M12 nut & tighten.
7. Fit 2nd M12 nut & tighten.
8. Fit safety split pin.
notE
The bearing is shipped in
the correct order on the
shaft. The bearing must
be installed in the correct
order or the firebox will
be too loose.
LOWER FLUE
THRUST BALL
BEARING
THRUST BALL
BEARING
BEARING CAP
WASHER
M12 NUTS
SAFETY SPLIT PIN
FIREBOX SLEEVE
important
Ensure the threaded
shaft does not knock
against the firebox when
engaging. This can damage
the thread.
Содержание THE AETHER SUSPENDED FIRES
Страница 2: ......
Страница 5: ...1 DIMENSIONS SPECIFICATIONS...
Страница 6: ...06...
Страница 9: ...aurora suspended fires 09 2 PLANNING...
Страница 10: ...10...
Страница 17: ...aurora suspended fires 17 3 INSTALLATION...
Страница 31: ......
Страница 32: ...61 0 2 6686 8408 65 Piper Dr Ballina NSW 2478 Australia www aurorasuspendedfires com Aurora...