③
Button board connection: The power cable (3p paired plug) and
cable (7p, 4p, 3p) on the button board must be docked on site. Power
cable (the black ones in below picture is required to be inserted in
pair), the cable can be inserted as 7p to 7p (red ones), 3p to 3p
(black ones), 4p to 4p (black ones in pair), 4p to 4p (red ones in pair),
as shown below:
Step 6: Module installation
* Module installation sequence should be from left to right, right to left
or from bottom to top, top to bottom, depending on the on-site
installation environment.
* Repair in time when flatness is not in good condition during
assembly;
①
The module connection mode is hard connection, which is
connected through the bridge board and the connector on the
module, therefore Forced insertion should be avoid during
installation. The connection example is shown below:
12