19
Assembly Instruction
KSA - T
WIN
S12 24V DC
I
NSTALLATION
STEP
9
A
:
A
SSEMBLY
FRAME
BRACKET
- D
RIVE
MOUNTED
ON
THE
WINDOW
AT
THE
TOP
05
¢
Insert the Chain unlocking key
y
in the hole.
¢
Pull both chains out manually by the same distance
(see chapter: „A
DJUSTING
THE
INITIAL
CHAIN
TENSION
AND
SMOOT
RUNNING
“.
¢
Connect chain with casement bracket. Pass shaft screw
M6 through and tighten.
¢
Attach drive to the frame brackets.
¢
Insert brass washers
•
and fi rmly tighten with
countersunk screws M8
Œ
. Drive should freely swivel.
¢
Produce drill holes with appropriate cross-section.
For the mounting dimensions please refer to the
above-mentioned hole layout drawings (see chapter
„I
NSTALLATIONSTEP
5 - 7“) or project-specifi c documents
and drawings).
¢
Fit frame brackets (Kxxx).
Make sure they are parallel to casement edge.
!
4 x M5
parallel
parallel
Kxxx
RA
Fxxx
FL
Kxxx
RA
Fxxx
FL
I
NSTALLATION
STEP
9
A
:
A
SSEMBLY
FRAME
BRACKET
- D
RIVE
MOUNTED
ON
THE
WINDOW
AT
THE
TOP
Cable on casement
Cable in glazing bead
Connection cable routing on the casement:
• The drive and its connection cable are swivelling.
As a consequence, foresee cable routing with a loop.
• Cable must be protected against damage (shearing-off, kinking,
splitting), i.e. by using bushings.
Upon removal of the glazing bead is the dan-
ger that the glass may fall.
!
¢
Route cable on or in the casement.
Cable crossover without
protective cable hose
Cable crossover with
protective cable hose
Connection cable routing on the hinge side:
• Make sure that during opening or closing procedure the cable will
not be damaged by shearing-off, kinking, crushing.
• Protect cable feedthrough in profi le e.g. by using cable bushings,
cable transitions.
RA
RA
FL
BD
AK
BD
AK
FL
RA
RA
FL
FL
Cable duct glued on
(in addition secured with
countersunk screws against
breaking away).
Drill hole in glazing bead
(cable bushing protects against
damage to cable).
1
2
RA
A
5