9.5.
Switch compartment: close
✔
If options (e.g. potentiometer, position transmitter) are available: Only close switch
compartment once all optional equipment has been successfully set.
Danger of corrosion due to damage to paint finish!
→
Touch up damage to paint finish after work on the device.
1.
Clean sealing faces of housing and cover.
2.
Check whether O-ring [3] is in good condition, replace if damaged.
3.
Apply a thin film of non-acidic grease (e.g. petroleum jelly) to the O-ring and
insert it correctly.
Figure 26:
4.
Place cover [1] on switch compartment.
5.
Fasten screws [2] evenly crosswise.
32
SAI 07.2 – SAI 16.2 / SARI 07.2 – SARI 16.2
Commissioning (basic settings)
for use in nuclear power plants